groundranger
Historic · latest filing Aug 2024Commercial

9001 Boulevard 26

North Richland Hills, TX 76180 · Nrh2o Nitro Blast Slide Construction Project, Nrh2o Beachside Bay Cabana Project

NRH2O plans a new waterslide and rental cabanas

A new waterslide on an existing tower and rental cabanas with connecting sidewalks are planned at the multi-tenant commercial site at 9001 Boulevard 26. TDLR registrations for the cabana project and slide project were filed on February 27 and August 26, 2024, respectively. The slide registration lists a 15,000-square-foot project and an applicant-estimated cost of $3.1 million.

Summarized from Texas Department of Licensing and Regulation records · updated Aug 26, 2024

Projects
2
2 filings
Latest filing
Aug 26, 2024
since Feb 27, 2024
Largest scope
15,000 sf
Estimated cost
$3.1M
state registration

Where this project stands

Inspected · closing out

NRH2O Nitro Blast Slide Construction Project

15,000 sq ft · $3.1M est.

  1. RegisteredAug 26, 2024
  2. Plan review
  3. ConstructionNov '24 – Aug '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. New waterslide construction on existing tower. new pedestrian paving for queuing and access from slide runout to base of the tower. — nrh2o family water park

    TDLR project registrationNew ConstructionInspection Complete15,000 sq ft$3.1M est.
    Tenant / owner
    Nrh2o Nitro Blast Slide Construction Project
    Design firm
    Pro
    Contact
    Pro
  2. Installation of rental cabanas and connecting sidewalks at nrh2o family water park. — nrh2o family water park

    TDLR project registrationNew ConstructionProject Closed10,000 sq ft$259K est.
    Tenant / owner
    Nrh2o Beachside Bay Cabana Project
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 9001 Boulevard 26

What is being built at 9001 Boulevard 26?

TDLR records list a new waterslide on an existing tower, plus rental cabanas and connecting sidewalks at NRH2O family water park. The registrations were filed February 27 and August 26, 2024.

Is NRH2O getting a new waterslide?

A TDLR registration dated August 26, 2024, describes a new waterslide on an existing tower, with paving for queuing and access from the slide runout to the tower base. The record is TABS2024026266.

Are new cabanas being built at NRH2O?

A TDLR registration describes rental cabanas and connecting sidewalks at NRH2O family water park. It was filed February 27, 2024, under record TABS2024012463.

How much will the NRH2O waterslide project cost?

The TDLR registration lists an applicant-estimated cost of $3.1 million for the waterslide project. This is an estimate, not a confirmed final cost.

How large is the NRH2O waterslide project?

The TDLR registration lists the waterslide project at 15,000 square feet. It was filed on August 26, 2024.

What is the status of the NRH2O waterslide project?

The TDLR record for the waterslide project lists its status as Inspection Complete. The registration was filed August 26, 2024.

Email me when the project is closed