27160 I-45 N
Oak Ridge North, TX 77385 · Fkc Oak Ridge Dialysis
Renovations planned for FKC Oak Ridge Dialysis
Repairs and interior alterations are planned for the existing FKC Oak Ridge Dialysis space at 27160 I-45 N. The TDLR project registration was filed on February 27, 2025, and describes work across 8,416 square feet, including restroom alterations and a new domestic water connection for a fire riser and sprinkler installation. The applicant’s estimated project cost is $100,000.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 27, 2025
- since Feb 27, 2025
- Largest scope
- 8,416 sf
- Estimated cost
- $100K
- state registration
Where this project stands
In state plan reviewFKC Oak Ridge Dialysis
8,416 sq ft · $100K est.
- RegisteredFeb 27, 2025
- Plan reviewnow
- ConstructionMar '25 – Jun '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRepairs on existing space. alteration of two office spaces. alterations on restrooms throughout space. addition of a new domestic water connection for a fire riser and sprinkler installation. — fkc oak ridge dialysis
TDLR project registrationRenovation/AlterationProject Registered8,416 sq ft$100K est.- Project #
- TABS2025012960
- Tenant / owner
- Fkc Oak Ridge Dialysis
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 27160 I-45 N
What is being built at 27160 I-45 N?
The TDLR registration describes repairs and alterations to the existing FKC Oak Ridge Dialysis space, not a new building. The work includes two office spaces, restrooms, and a domestic water connection for a fire riser and sprinkler installation.
Is a new dialysis center opening in Oak Ridge North?
The February 27, 2025, registration describes repairs and alterations to an existing dialysis space. It does not report a new opening.
When was the FKC Oak Ridge Dialysis project permitted?
The project was registered with TDLR on February 27, 2025. Its registration number is TABS2025012960.
How much will the FKC Oak Ridge Dialysis renovation cost?
The TDLR registration lists an applicant-estimated cost of $100,000. This is an estimate for the project, not a confirmed final cost.
What work is planned at FKC Oak Ridge Dialysis?
The registration describes repairs, alterations to two office spaces, restroom alterations, and a new domestic water connection for a fire riser and sprinkler installation.
What is being renovated near Wood Ridge Improvements?
The FKC Oak Ridge Dialysis space at 27160 I-45 N is about 190 meters from Wood Ridge Improvements, at 27490 Interstate 45. Its TDLR registration describes repairs and interior alterations.
Also being built nearby
All of 77385- 27490 Interstate 45 · Wood Ridge ImprovementsMar 17, 2026Boot barn — renovation/alteration — interior alteration to include new walls finishes fixtures and paint · 190 m away
- 1201 Lake Robbins Dr · Hh Woodlands Tower HoldingsJul 23, 2026Oxy woodlands turnstiles — renovation/alteration — minor interior renovation to include new security desk and turnstiles · 227 m away
- 1330 Lake Robbins Drive · Town Center 72 LLCOct 21, 2026Svn - risk strategy — renovation/alteration — interior renovation of lease space on level 04. renovation to include modification of walls, new finishes, modified electrical and plumbing · 486 m away
- 1330 Lake Robbins Dr · Town Center 72, LLCNov 20, 2024Woodforest national bank - commercial lending — renovation/alteration — interior renovation of existing office space, break room, and private offices · 486 m away
More offices in 77385.