201 W. University
Odessa, TX 79764 · Odessa College
Odessa College pedestrian bridge registered in October 2024
A new pedestrian bridge is planned at Odessa College, 201 W. University. The project was registered with the Texas Department of Licensing and Regulation on October 28, 2024; the applicant estimated its cost at $2.75 million. The registration lists the project status as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2024
- since Oct 28, 2024
- Largest scope
- 1 sf
- Estimated cost
- $2.8M
- state registration
Where this project stands
CompletedPedestrian Bridge
1 sq ft · $2.8M est.
- RegisteredOct 28, 2024
- Plan review
- ConstructionJan '25 – Nov '25
- Inspected
- Closed
Ran as a 11-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruction of a new pedestrian bridge. — odessa college
TDLR project registrationNew ConstructionProject Closed1 sq ft$2.8M est.- Project #
- TABS2025004252
- Tenant / owner
- Pedestrian Bridge
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 201 W. University
What is being built at 201 W. University in Odessa?
A new pedestrian bridge at Odessa College is listed in a Texas Department of Licensing and Regulation project registration dated October 28, 2024.
Is Odessa College building a pedestrian bridge?
A TDLR registration describes construction of a new pedestrian bridge at Odessa College. It lists the project status as closed.
When was the Odessa College pedestrian bridge registered?
The project was registered on October 28, 2024, under TDLR project number TABS2025004252.
How much is the Odessa College pedestrian bridge estimated to cost?
The applicant’s TDLR estimate for the project is $2.75 million.
Where is the new pedestrian bridge planned?
The registration places the project at 201 W. University in Odessa, at Odessa College.
Is the Odessa College pedestrian bridge open?
The available record describes the bridge project and lists its status as closed, but does not say whether the bridge is open.
Also being built nearby
All of 79764- 201 W. University Blvd · Odessa CollegeFeb 13, 2026Early college high school remodel — renovation/alteration — alteration of an existing 2-story building for two early college high schools
- 2727 Andrews Highway · Precious Smiles DentistryAug 19, 2025Dr. rameau dentistry — renovation/alteration — total renovation of 4600 sq ft to become dental office · 187 m away
- 106 E University Blvd · Chick-Fil-A, Inc.May 23, 2024Cfa 03975 odessa cps remodel — renovation/alteration — extension of the drive-thru cockpit area, building expansion, relocation of an exterior door and canopy. site work · 202 m away
- 2840 Andrews Hwy · Milano Nail SpaJan 24, 2024Milano nail spa — renovation/alteration — interior remodel · 281 m away
- 305 E University · Once Upon A ChildNov 2, 2026Once upon a child — renovation/alteration — alteration of the interior of an existing commercial building, with a few new exterior doors and storefront · 391 m away
- 300 E 29th St · Ector County Independent School DistrictApr 22, 2026Ecisd pr1&2 - new tech odessa high school — renovation/alteration — accessibility updates to parking and walkways. non accessibility scope includes replacement of exterior waterproofing and joint sealants and roof top hvac units · 444 m away