10185 FM 1960
Old River Winfree, TX 77536 · Frontier K2, LLC
Waste transfer station building planned on FM 1960
A 15,188-square-foot pre-engineered metal building for a waste-transfer station was registered with TDLR on December 30, 2024, at 10185 FM 1960 in Old River Winfree. The registration describes a building where trucks can unload waste to be sorted into larger trucks for removal off-site. The applicant’s estimated project cost is $3.52 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 30, 2024
- since Dec 30, 2024
- Largest scope
- 15,188 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
Finishing up · inspection nextFrontier Waste Solutions
15,188 sq ft · $3.5M est.
- RegisteredDec 30, 2024
- Plan review
- ConstructionFeb '25 – Feb '26
- Inspectednow
- Closed
Scheduled to finish Feb 15, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectOne, pre- engineered metal building for the purpose of allowing trucks to unload their haul to be sorted into larger trucks for removal of the haul off-site — transfer station
TDLR project registrationNew ConstructionReview Complete15,188 sq ft$3.5M est.- Project #
- TABS2025008558
- Tenant / owner
- Frontier Waste Solutions
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 10185 FM 1960
What is being built at 10185 FM 1960?
A 15,188-square-foot pre-engineered metal building for a waste-transfer station is planned. TDLR registration TABS2025008558 describes trucks unloading waste to be sorted into larger trucks for off-site removal.
When was the FM 1960 transfer station registered?
The project was registered with TDLR on December 30, 2024. Its registration status is listed as Review Complete.
How big is the planned building at 10185 FM 1960?
The TDLR registration lists the building at 15,188 square feet.
What will the building at 10185 FM 1960 be used for?
The registration describes a transfer station where trucks unload waste, which is sorted into larger trucks for removal off-site.
What is the estimated cost of the FM 1960 transfer station?
The applicant’s TDLR estimate for the project is $3.52 million.
What is being built next to Frontier K2 on FM 1960?
At 10185 FM 1960, a TDLR registration describes a 15,188-square-foot building for a waste-transfer station. The registration was filed December 30, 2024.