groundranger
Recent · latest filing Jul 2026Commercial

2211 Genoa Red Bluff Rd

Pasadena, TX 77505 · Summit Hydraulics, Grb II

Summit Hydraulics plans interior build-out in Pasadena

A TDLR registration indicates an interior build-out for Summit Hydraulics in an existing 27,966-square-foot building at 2211 Genoa Red Bluff Road. The project was registered on July 14, 2026, and lists an estimated cost of $2,097,450.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 14, 2026

Projects
2
2 filings
Latest filing
Jul 14, 2026
since Sep 19, 2024
Largest scope
27,966 sf
Estimated cost
$2.1M
state registration

Where this project stands

Under construction

Summit Hydraulics

27,966 sq ft · $2.1M est.

  1. RegisteredJul 14, 2026
  2. Plan review
  3. ConstructionAug '26 – Aug '27
  4. Inspected
  5. Closed
26% through of a 12-month buildAug 17, 2026 → Aug 17, 2027

4 contacts on this project · 4 phone numbers

Permit & project history

2 projects
  1. Summit Hydraulics

    Interior build out of an existing 27,966 s.f. building. located at 2211 genoa red bluff rd, pasadena, tx 77505, city of pasadena, for a company called summit hydraulics. — grb ii, building 4

    TDLR project registrationRenovation/AlterationReview Complete27,966 sq ft$2.1M est.
    Tenant / owner
    Summit Hydraulics
    Design firm
    Pro
    Contact
    Pro
  2. GRB II

    This project involves new construction and associated site work, of a 27,966 s.f. building. located at 2211 genoa red bluff rd, pasadena, tx 77505, city of pasadena. shell building is intended for office/warehouse and future high piled storage. — grb ii, building 4

    TDLR project registrationNew ConstructionInspection Complete27,966 sq ft$1.9M est.
    Tenant / owner
    Grb II
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2211 Genoa Red Bluff Rd

What is being built at 2211 Genoa Red Bluff Road?

A TDLR registration describes an interior build-out for Summit Hydraulics in an existing 27,966-square-foot building. It does not describe a new building.

Is Summit Hydraulics opening at 2211 Genoa Red Bluff Road?

The TDLR registration identifies Summit Hydraulics and describes an interior build-out. It does not state an opening date.

When was the Summit Hydraulics project registered?

The project was registered on July 14, 2026. Its TDLR record, TABS2026025201, is marked “Review Complete.”

How much will the Summit Hydraulics build-out cost?

The TDLR record lists an estimated project cost of $2,097,450. This is the applicant’s estimate, not a final reported project cost.

What is being built next to Evie's Snacks on Genoa Red Bluff?

At 2211 Genoa Red Bluff Road, next to Evie's Snacks - Houston Processing Facility at 2209 Genoa Red Bluff, a TDLR registration describes an interior build-out for Summit Hydraulics. The registration was filed July 14, 2026.

Is the building at 2211 Genoa Red Bluff a new construction project?

No new construction is described in the TDLR record. It identifies an interior build-out of an existing 27,966-square-foot building.

Also being built nearby

All of 77505

More warehouses & industrial in 77505, offices in 77505.

Email me when it passes inspection