groundranger
Recent · latest filing Jun 2026Commercial

35678 Clapp Rd

Pattison, TX 77423 · Ztd Reality LLC

7,800-square-foot diesel repair building registered in Pattison

A 7,800-square-foot metal prefabricated building for light-duty diesel repair is planned at 35678 Clapp Road in Pattison. The project was registered with the Texas Department of Licensing and Regulation on June 20, 2026, as project TABS2026023390. The applicant’s estimated project cost is $1.2 million.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 20, 2026

Projects
1
1 filings
Latest filing
Jun 20, 2026
since Jun 20, 2026
Largest scope
7,800 sf
Estimated cost
$1.2M
state registration

Where this project stands

In state plan review

Zero Tolerance Diesel

7,800 sq ft · $1.2M est.

  1. RegisteredJun 20, 2026
  2. Plan reviewnow
  3. ConstructionFeb '25 – Aug '26
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Metal prefab building used for light duty diesel repair. — zero tolerance diesel

    TDLR project registrationNew ConstructionProject Registered7,800 sq ft$1.2M est.
    Tenant / owner
    Zero Tolerance Diesel
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 35678 Clapp Rd

What is being built at 35678 Clapp Road in Pattison?

A 7,800-square-foot metal prefabricated building for light-duty diesel repair is planned at the address. The project was registered with TDLR on June 20, 2026.

Is Zero Tolerance Diesel building a new facility in Pattison?

A TDLR registration names Zero Tolerance Diesel and describes a new metal prefabricated building for light-duty diesel repair at 35678 Clapp Road. The registration date is June 20, 2026.

How large is the new building at 35678 Clapp Road?

The registered project is 7,800 square feet. It is described as a metal prefabricated building for light-duty diesel repair.

How much will the Zero Tolerance Diesel project cost?

The applicant’s estimated cost for the project is $1.2 million, according to TDLR registration TABS2026023390.

When was the diesel repair building in Pattison registered?

The project was registered with the Texas Department of Licensing and Regulation on June 20, 2026. The registration lists it as new construction.

Email me when plan review is complete