5331 W Orange Street
Pearland, TX 77581 · Rollac Shutter Of Texas, Inc.
16,800-square-foot manufacturing addition in Pearland
A 16,800-square-foot tilt-wall structure for manufacturing is planned as an addition at 5331 W Orange Street in Pearland. The project was registered with TDLR on January 20, 2025, under project number TABS2025009935. The applicant estimated the project cost at $1,687,688.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 20, 2025
- since Jan 20, 2025
- Largest scope
- 16,800 sf
- Estimated cost
- $1.7M
- state registration
Where this project stands
In state plan reviewRS MANUFACTURING
16,800 sq ft · $1.7M est.
- RegisteredJan 20, 2025
- Plan reviewnow
- ConstructionFeb '25 – Oct '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectAdd 16,800 sq ft tilt-wall structure for manufacturing. no plumbing, no conditioned air, no build-out, no restrooms — rollac shutter of texas
TDLR project registrationAdditions to Existing BuildingProject Registered16,800 sq ft$1.7M est.- Project #
- TABS2025009935
- Tenant / owner
- Rs Manufacturing
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5331 W Orange Street
What is being built at 5331 W Orange Street in Pearland?
The TDLR registration describes a 16,800-square-foot tilt-wall structure for manufacturing, added to an existing building. It names RS Manufacturing.
When was the manufacturing addition at 5331 W Orange Street registered?
The project was registered with TDLR on January 20, 2025. Its project number is TABS2025009935.
How large is the new structure at 5331 W Orange Street?
The project registration lists 16,800 square feet for the addition.
What is the estimated cost of the project at 5331 W Orange Street?
The applicant's TDLR estimate is $1,687,688. This is an estimate, not a confirmed final project cost.
Will the manufacturing addition at 5331 W Orange Street have restrooms or plumbing?
The project description says the addition has no plumbing, conditioned air, build-out, or restrooms.