16100 South Freeway
Pearland, TX 77584 · Mh Pearland Hospital Or Build-Out, Mh Meic Pearland Ct + 1 more
Hospital operating room build-out and CT room upgrade
Two renovation projects are registered for the multi-tenant building at 16100 South Freeway: a third-floor operating room build-out and a CT room equipment replacement at Memorial Hermann Pearland Hospital. TDLR registrations were filed November 25, 2025, for the CT work and August 27, 2026, for the operating room project.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 27, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 27, 2026
- since Nov 25, 2025
- Largest scope
- 2,559 sf
- Estimated cost
- $2.0M
- state registration
Where this project stands
Under constructionMH Pearland Hospital OR Build-Out
2,559 sq ft · $2.0M est.
- RegisteredAug 27, 2026
- Plan review
- ConstructionOct '26 – May '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsInterior remodeling of an existing shell space within an existing or suite on the third floor, to create a new operating room, storage rooms, and two new recovery (pacu) patient bed bays. the project will also create a new doctor dictation room. — memorial hermann pearland hospital
TDLR project registrationRenovation/AlterationReview Complete2,559 sq ft$2.0M est.- Project #
- TABS2026029014
- Tenant / owner
- Mh Pearland Hospital Or Build-Out
- Design firm
- Pro
- Contact
- Pro
The replacement of ct imaging equipment installation and minor renovation of an existing ct room and control room. this includes new equipment, new finishes and infrastructure modifications to support the new equipment and its requirements — memorial hermann pearland hospital
TDLR project registrationRenovation/AlterationProject Closed525 sq ft$250K est.- Project #
- TABS2026006758
- Tenant / owner
- Mh Meic Pearland Ct
- Design firm
- Pro
- Contact
- Pro
Interior remodeling of approximately 1,044 s.f. of an existing hospital radiology department on the first floor, in order to exchange the mri scanner. interior remodeling only. — memorial hermann pearland hospital
TDLR project registrationRenovation/AlterationProject Closed1,044 sq ft$250K est.- Project #
- TABS2023021399
- Tenant / owner
- Meic Memorial Hermann Pearland Hospital Mri Exchange
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 16100 South Freeway
What is being built at 16100 South Freeway in Pearland?
TDLR records describe two renovations at the multi-tenant building: a new operating room, storage rooms, two recovery bays and a doctor dictation room, plus a CT room equipment replacement.
Is Memorial Hermann Pearland Hospital expanding?
The records show renovations within the existing hospital, including an operating room build-out and work in an existing CT room and control room. They do not describe a new hospital building.
When was the operating room project registered?
The TDLR registration for the operating room build-out was filed August 27, 2026. It covers 2,559 square feet and is listed as review complete.
What is changing in the hospital's CT room?
A TDLR registration filed November 25, 2025, describes replacement CT imaging equipment and minor renovations to the existing CT room and control room, including new finishes and infrastructure modifications.
How much is the operating room renovation estimated to cost?
The TDLR registration lists an applicant estimate of $2 million for the operating room project. This is an estimate for that project, not a reported total cost for the site.
Are these projects new construction?
The TDLR records classify both projects as renovations or alterations to existing hospital space. One remodels a shell space on the third floor, and the other upgrades existing CT rooms.
More warehouses & industrial in 77584, medical facilities in 77584.