groundranger
Historic · latest filing Jan 2025Commercial

16100 South Freeway, Level 2

Pearland, TX 77584 · Memorial Hermann Health System

Memorial Hermann Pearland plans NM/CT equipment replacement

A 446-square-foot build-out for NM/CT medical equipment replacement is planned at Memorial Hermann Pearland Hospital. The project was registered with the Texas Department of Licensing and Regulation on January 31, 2025, and involves an existing shell space with no planned changes to exterior or demising walls or entry and exit access.

Summarized from Texas Department of Licensing and Regulation records · updated Jan 31, 2025

Projects
1
1 filings
Latest filing
Jan 31, 2025
since Jan 31, 2025
Largest scope
446 sf
Estimated cost
$160K
state registration

Where this project stands

Completed

MH Pearland Hospital NM/CT Equipment Replacement

446 sq ft · $160K est.

  1. RegisteredJan 31, 2025
  2. Plan review
  3. ConstructionMar '25 – Sep '25
  4. Inspected
  5. Closed

Ran as a 6-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. This project consists of the build-out of an existing white-box shell space with the installation of medical equipment with no change to exterior walls, demising walls, or entry/exit access to the existing space — memorial hermann pearland hospital

    TDLR project registrationRenovation/AlterationProject Closed446 sq ft$160K est.
    Tenant / owner
    Mh Pearland Hospital Nm/Ct Equipment Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 16100 South Freeway, Level 2

What is being built at 16100 South Freeway in Pearland?

The project is a build-out of existing shell space at Memorial Hermann Pearland Hospital for NM/CT equipment replacement. The TDLR registration describes a 446-square-foot project.

Is Memorial Hermann Pearland Hospital expanding?

The TDLR project record describes equipment installation in existing shell space, with no change to exterior walls, demising walls, or entry and exit access. It does not describe an expansion.

When was the Pearland hospital equipment project filed?

The project was registered with the Texas Department of Licensing and Regulation on January 31, 2025. Its registration number is TABS2025010812.

How much will the Memorial Hermann Pearland project cost?

The TDLR registration lists an estimated project cost of $160,000. This is the applicant's estimate.

What kind of work is planned at Memorial Hermann Pearland Hospital?

The project is classified as a renovation or alteration and consists of a build-out in existing shell space to install NM/CT medical equipment. The TDLR record lists the project status as closed.

More medical facilities in 77584.

Get alerts for 16100 South Freeway, Level 2