1608 Town Center Blvd
Pflugerville, TX 78660 · A-S 93 SH 130-SH 45 LP
Chocolate Bash dessert restaurant build-out in Pflugerville
A 1,406-square-foot interior build-out for Chocolate Bash, described as a dessert restaurant, was registered on July 28, 2026, at 1608 Town Center Blvd in Pflugerville. The scope includes new walls, plumbing, mechanical and electrical work, and finishes; the applicant estimated the project cost at $350,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 28, 2026
- since Jul 28, 2026
- Largest scope
- 1,406 sf
- Estimated cost
- $350K
- state registration
Where this project stands
Under constructionCHOCOLATE BASH
1,406 sq ft · $350K est.
- RegisteredJul 28, 2026
- Plan review
- ConstructionSep '26 – Feb '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior build out for a dessert restaurant. scope of work consists of new metal stud walls, plumbing, mechanical , electrical and new finishes. — stone hill town center
TDLR project registrationRenovation/AlterationReview Complete1,406 sq ft$350K est.- Project #
- TABS2026026401
- Tenant / owner
- Chocolate Bash
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1608 Town Center Blvd
What is being built at 1608 Town Center Blvd?
A 1,406-square-foot interior build-out for Chocolate Bash, described in the TDLR registration as a dessert restaurant. The registration, TABS2026026401, was filed July 28, 2026.
Is a new restaurant opening at 1608 Town Center Blvd in Pflugerville?
A TDLR project registration lists an interior build-out for a dessert restaurant called Chocolate Bash. It does not give an opening date.
What work is planned for the Chocolate Bash space?
The listed scope includes new metal stud walls, plumbing, mechanical and electrical work, and new finishes. The project is classified as a renovation or alteration.
How much will the Chocolate Bash build-out cost?
The applicant's estimated cost for the project is $350,000, according to the TDLR registration filed July 28, 2026.
What's being built near Piada Italian Street Food on Town Center Drive?
A TDLR registration lists a 1,406-square-foot interior build-out for Chocolate Bash, a dessert restaurant, at 1608 Town Center Blvd. Piada Italian Street Food is listed at the same street address.
Has the Chocolate Bash project been approved?
The TDLR project registration, TABS2026026401, shows a status of Review Complete. The record does not state an opening date.
Also being built nearby
All of 78660- 1608 Town Center Drive · Stone Hill Town CenterMar 30, 2026Piada italian street food — renovation/alteration — interior renovation to existing tenant space
- 18617 Limestone Commercial Dr · Chick-Fil-AOct 22, 2024Chick-fil-a #02337 pflugerville — renovation/alteration — remodel to existing chick-fil-a restaurant · 171 m away
- 18700 Limestone Commercial Drive · A-S 93 SH 130-SH 45 LPApr 3, 2024Daiso — renovation/alteration — sq ft 8220. this is an existing retail establishment being remodeled for a new tenant with updated equipment, fixtures and new finishes. exterior work includes adding a new overhead door at the back of the tenant space for loading area · 318 m away
- 18709 Limestone Commerical Dr · Stone Hill Town CenterAug 12, 2025Cava mezze grill — new construction — tenant improvement to an existing 2625 sq ft building. mechanical, electrical, and plumbing included for a fast casual restaurant · 332 m away
- 18708 Limestone Commercial Dr · H&r Block - PflugervilleSep 30, 2026H&r block - pflugerville — renovation/alteration — 1,125 sq ft renovation for h&r block space · 332 m away
- 1401 Town Center Dr · A-S 93 SH 130-SH 45, LPSep 9, 2026Water wings swim school - pflugerville — renovation/alteration — the installation of two swiming pools, restrooms. change rooms, and showers · 554 m away
- 1401 Town Center Drive · Stone Hill Town CenterOct 16, 2025Stone hill town center - tract 7 — new construction — cold, dark building shell with limited sitework · 554 m away
More restaurants in 78660.