5201 Wolf Pack Dr

Pflugerville, TX 78660 · Weiss Hs - Turf Design, Weiss High School Weight Room

Weiss High School plans turf fields and a new student driveway

A new student driveway on Weiss Lane, artificial turf for the baseball and softball fields, and a detention pond are planned at Weiss High School. The project was registered with TDLR on March 12, 2026, under project number TABS2026014875. The applicant's estimated project cost is $2.5 million.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 12, 2026

Projects
2
2 filings
Latest filing
Mar 12, 2026
since Mar 12, 2026
Largest scope
231,187 sf
Estimated cost
$2.5M
state registration

Where this project stands

In state plan review

WEISS HS - TURF DESIGN

231,187 sq ft · $2.5M est.

  1. RegisteredMar 12, 2026
  2. Plan reviewnow
  3. ConstructionDec '27 – Dec '28
  4. Inspected
  5. Closed

Construction is scheduled to start Dec 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. Construction of a new student driveway on weiss ln, installation of artificial turf to one (1) baseball field and one (1) softball field to replace existing natural grass, and a new detention pond to accommodate for the increase of impervious cover. — weiss high school

    TDLR project registrationNew ConstructionProject Registered231,187 sq ft$2.5M est.
    Tenant / owner
    Weiss Hs - Turf Design
    Design firm
    Pro
    Contact
    Pro
  2. A new single story 5,595 sq ft weight room — wolf pack building champions

    TDLR project registrationNew ConstructionInspection Complete5,595 sq ft$2.0M est.
    Tenant / owner
    Weiss High School Weight Room
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5201 Wolf Pack Dr

What is being built at 5201 Wolf Pack Dr in Pflugerville?

Plans for Weiss High School include a new student driveway on Weiss Lane, artificial turf for one baseball field and one softball field, and a new detention pond. The project was registered with TDLR on March 12, 2026.

Are new turf fields planned at Weiss High School?

Yes. The TDLR registration describes artificial turf replacing existing natural grass on one baseball field and one softball field.

Is Weiss High School getting a new driveway?

The project registration includes construction of a new student driveway on Weiss Lane. It was filed with TDLR on March 12, 2026.

Why is a detention pond included in the Weiss High School project?

The registration says a new detention pond is planned to accommodate the increase in impervious cover from the work.

How much will the Weiss High School turf project cost?

The applicant's estimated cost for the project is $2.5 million, according to TDLR registration TABS2026014875. This is an estimate, not a final project cost.