groundranger
Recent · latest filing May 2026Commercial

1153 US-377 N/A

Pilot Point, TX 76208 · Bw Gas And Retail, LLC

Allsup's gas station renovation in Pilot Point

An existing Allsup's gas station at 1153 US-377 N is being renovated, with work limited to the sales floor, storefront and walk-in cooler. The project was registered with TDLR on May 14, 2026, and the existing building and site are to remain.

Summarized from Texas Department of Licensing and Regulation records · updated May 14, 2026

Projects
1
1 filings
Latest filing
May 14, 2026
since May 14, 2026
Largest scope
2,457 sf
Estimated cost
$200K
state registration

Where this project stands

Inspected · closing out

Allsups Gast Station Renovation

2,457 sq ft · $200K est.

  1. RegisteredMay 14, 2026
  2. Plan review
  3. ConstructionJun '26 – Jul '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 4 phone numbers

Permit & project history

1 project
  1. Existing building and site to remain. scope of work is limited improvement of the interior sale floor area including flooring replacement and new paint; replacement of storefront; and replacement of walk-in cooler — allsups gas station

    TDLR project registrationRenovation/AlterationInspection Complete2,457 sq ft$200K est.
    Tenant / owner
    Allsups Gast Station Renovation
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1153 US-377 N/A

What is being built at 1153 US-377 N in Pilot Point?

The project is a renovation of an existing Allsup's gas station, not a new building. The TDLR registration says the existing building and site will remain.

What work is planned at the Allsup's gas station?

The scope includes replacing flooring and painting the interior sales floor, replacing the storefront, and replacing the walk-in cooler. The project covers 2,457 square feet.

When was the Allsup's renovation registered?

The TDLR project registration was filed May 14, 2026. Its project number is TABS2026020322.

How much will the Allsup's renovation cost?

The TDLR registration lists an estimated project cost of $200,000. This is the applicant's estimate.

Is the Allsup's renovation near La Crema House?

Yes. The project is at 1153 US-377 N, about 27 meters from La Crema House at 1137 US 377.

What is the status of the Allsup's gas station renovation?

The TDLR record lists the project status as Inspection Complete.

Also being built nearby

All of 76208
Email me when the project is closed