6321 FM 1385
Pilot Point, TX 76258 · City Of Pilot Point, Texas
New Pilot Point Fire Station #3 at 6321 FM 1385
A new 14,571-square-foot, single-story fire station for the City of Pilot Point is planned at 6321 FM 1385. The project was registered with the Texas Department of Licensing and Regulation on January 18, 2024, as TABS2024009592. The applicant estimated the project cost at $7 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 18, 2024
- since Jan 18, 2024
- Largest scope
- 14,571 sf
- Estimated cost
- $7.0M
- state registration
Where this project stands
Inspected · closing outCity of Pilot Point Fire Station #3
14,571 sq ft · $7.0M est.
- RegisteredJan 18, 2024
- Plan review
- ConstructionApr '24 – Oct '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe project consists of a new 14,571 gsf, single-story, fire station for the city of pilot point, tx. construction will utilize a pre-engineered metal building frame with light gauge metal studs, metal roofing and faux stone veneer, and parking. — fire station #3
TDLR project registrationNew ConstructionInspection Complete14,571 sq ft$7.0M est.- Project #
- TABS2024009592
- Tenant / owner
- City Of Pilot Point Fire Station #3
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6321 FM 1385
What is being built at 6321 FM 1385 in Pilot Point?
The project is a new, 14,571-square-foot fire station for the City of Pilot Point, identified as Fire Station #3.
When was Pilot Point Fire Station #3 registered?
The project was registered with the Texas Department of Licensing and Regulation on January 18, 2024. Its registration number is TABS2024009592.
How large will the new Pilot Point fire station be?
The TDLR registration describes a single-story fire station measuring 14,571 gross square feet.
How much is the Pilot Point Fire Station #3 project estimated to cost?
The applicant's estimated cost for the project is $7 million.
What is the status of the Fire Station #3 project?
The TDLR record lists the project status as “Inspection Complete.”