1101 Jackson Dr, Plano, TX 75075
Plano, TX 75075 · Plano Independent School District
Jackson Elementary renovations registered in October 2024
Renovations at Jackson Elementary School include roof and HVAC equipment replacements, sprinkler valve and HVAC control work, corridor floor finishes, and repairs to a café window. The TDLR project registration was filed October 11, 2024, and lists an estimated project cost of $3.5 million. The registration shows the project status as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 11, 2024
- since Oct 11, 2024
- Largest scope
- 20,000 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
Completed2377 Plano ISD Jackson ES Renovations
20,000 sq ft · $3.5M est.
- RegisteredOct 11, 2024
- Plan review
- ConstructionMay '25 – Aug '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectReplacement of corridor floor finishes, replacement of fire sprinkler valves, replacement of hvac controls, replacement of (5) hvac equipment, replacement of hvac equipment screens, replacement of marquee sign, replacement of roof, fix cafe window — jackson elementary school
TDLR project registrationRenovation/AlterationProject Closed20,000 sq ft$3.5M est.- Project #
- TABS2025003051
- Tenant / owner
- 2377 Plano ISD Jackson Es Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1101 Jackson Dr, Plano, TX 75075
What is being renovated at 1101 Jackson Dr in Plano?
A TDLR registration describes renovations at Jackson Elementary School, including roof and HVAC equipment replacements, corridor floor finishes, sprinkler valve and HVAC control work, a marquee sign replacement, and a café window repair.
When were the Jackson Elementary renovations registered?
The TDLR project registration was filed October 11, 2024. It is listed as project TABS2025003051.
How much are the Jackson Elementary renovations expected to cost?
The TDLR registration lists an estimated project cost of $3.5 million. This is the applicant’s estimate for the project.
How large is the Jackson Elementary renovation project?
The TDLR registration lists the project area as 20,000 square feet.
Are the Jackson Elementary renovations complete?
The TDLR record lists the project status as “Project Closed.” The record does not provide a completion date.
What is being renovated near Delta Electronics in Plano?
The Jackson Elementary School renovation at 1101 Jackson Dr is about 518 meters from Delta Electronics at 601 Data Drive, according to the nearby-landmark record.
Also being built nearby
All of 75075- 601 Data Drive · Delta Electronics Usa, Inc.May 15, 2026Interior renovations at delta electronics - lift and slab opening — renovation/alteration — a new 8x8 materials lift and a 8x8 slab opening on the 2nd floor · 518 m away
- 601 Data Dr · Delta Electronics (usa) INCOct 27, 2026240 lab - plano — renovation/alteration — shift existing non load bearing wall about 3 ft inside to make the room smaller. 1440 sq ft · 518 m away
- 1421 Gables Ct · Raymond J Adams Co.Mar 28, 2025Raymond j adams co. — new construction — office building (3,769 sq ft) and parking lot (10,700 sq ft) · 562 m away
More restaurants in 75075.