4301 Mapleshde Lane
Plano, TX 75075 · Lifepoint Health
WellBridge Plano to become a 40-bed rehab hospital
A renovation and addition at 4301 Mapleshde Lane is intended to convert the existing 48-bed WellBridge Plano inpatient behavioral hospital into a 40-bed rehabilitation hospital. Lifepoint Health’s project was registered with TDLR on February 10, 2025. The applicant estimated the project cost at $15,301,475; the TDLR record lists the project status as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 10, 2025
- since Feb 10, 2025
- Largest scope
- 45,821 sf
- Estimated cost
- $15M
- state registration
Where this project stands
Inspected · closing outWellBridge Plano Rehab Hospital Renovation/addition
45,821 sq ft · $15M est.
- RegisteredFeb 10, 2025
- Plan review
- ConstructionJul '25 – Apr '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectLifepoint health intends to convert the existing 48-bed wellbridge plano inpatient behavioral hospital into a 40-bed rehabilitation hospital. — wellbridge plano irf
TDLR project registrationRenovation/AlterationInspection Complete45,821 sq ft$15M est.- Project #
- TABS2025011501
- Tenant / owner
- Wellbridge Plano Rehab Hospital Renovation/Addition
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4301 Mapleshde Lane
What is being built at 4301 Mapleshde Lane in Plano?
A renovation and addition intended to convert the existing WellBridge Plano inpatient behavioral hospital into a 40-bed rehabilitation hospital. The TDLR registration says the existing facility has 48 beds.
Is a new hospital going in at 4301 Mapleshde Lane?
The project description says Lifepoint Health intends to convert the existing WellBridge Plano hospital into a rehabilitation hospital, rather than build a new hospital. The TDLR registration was filed February 10, 2025.
Who is behind the WellBridge Plano hospital renovation?
The TDLR project registration names Lifepoint Health and describes a renovation and addition to convert the existing hospital into a 40-bed rehabilitation hospital.
How much will the WellBridge Plano project cost?
The applicant’s estimated cost for the project is $15,301,475, according to its TDLR registration. This is an estimate, not a confirmed final cost.
What is the status of the WellBridge Plano renovation?
The TDLR record lists the project status as inspection complete. The project registration was filed on February 10, 2025.
What is being built near North Texas Transit Authority in Plano?
At 4301 Mapleshde Lane, about 31 meters from the North Texas Transit Authority at 4280 Mapleshade Lane, a renovation and addition is intended to convert WellBridge Plano into a 40-bed rehabilitation hospital.
Also being built nearby
All of 75075- 4280 Mapleshade Ln · North Texas Transit AuthorityOct 12, 2025Mlp-7 roof replacement — renovation/alteration — new roof system, access ladders, fall protection, masonry repair, window repair, sidewalk improvements, misc work · 31 m away
- 7253 Dogwood Creek LnSep 11, 2024Replace hvac system · 482 m away
- 7229 Dogwood Creek LnAug 21, 20267229 dogwood creek install 6 concrete pilings to stabilize foundation · 501 m away
- 18624 Highland Creek LnDec 8, 2025Move existing outdoor unit · 560 m away
- 7159 Pecan Creek LnMay 26, 2026Install new soccer tub and shower at master bathroom and installed new distribution gas line for gas stove, appliance only · 572 m away
- 6923 Maple Creek LnNov 2, 2026Installing piers under the home to stabilize the foundation · 574 m away
- 6915 Maple Creek LnSep 4, 2025Residential re-roof shingle roof · 580 m away
- 6904 Maple Creek LnSep 8, 20266904 maple creek install 6 concrete pilings to stabilize foundation · 595 m away