1308 Village Creek Dr
Plano, TX 75093 · Village Creek Surgery Center, Village Creek Clinic
Interior renovations planned for two medical spaces in Plano
TDLR registrations indicate interior renovations for Village Creek Surgery Center and Village Creek Clinic at 1308 Village Creek Dr. The clinic project was registered Jan. 2, 2024, and the surgery center project followed on Jan. 4, 2024.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 4, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jan 4, 2024
- since Jan 2, 2024
- Largest scope
- 3,823 sf
- Estimated cost
- $500K
- state registration
Where this project stands
Finishing up · inspection nextVillage Creek Surgery Center
3,823 sq ft · $500K est.
- RegisteredJan 4, 2024
- Plan review
- ConstructionFeb '24 – May '26
- Inspectednow
- Closed
Scheduled to finish May 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsInterior renovation. — village creek surgery center
TDLR project registrationRenovation/AlterationReview Complete3,823 sq ft$500K est.- Project #
- TABS2024008539
- Tenant / owner
- Village Creek Surgery Center
- Design firm
- Pro
- Contact
- Pro
Interior renovation. — village creek clinic
TDLR project registrationRenovation/AlterationReview Complete3,098 sq ft$450K est.- Project #
- TABS2024008407
- Tenant / owner
- Village Creek Clinic
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1308 Village Creek Dr
What is being built at 1308 Village Creek Dr in Plano?
TDLR registrations describe interior renovations for Village Creek Surgery Center and Village Creek Clinic in this multi-tenant building.
What businesses are listed for the renovations at 1308 Village Creek Dr?
The registrations name Village Creek Clinic and Village Creek Surgery Center. They describe separate interior renovation projects.
When were the Village Creek Clinic and surgery center projects registered?
The Village Creek Clinic project was registered Jan. 2, 2024, as TABS2024008407. The Village Creek Surgery Center project was registered Jan. 4, 2024, as TABS2024008539.
How much are the renovations at 1308 Village Creek Dr estimated to cost?
TDLR lists applicant estimates of $450,000 for the clinic renovation and $500,000 for the surgery center renovation.
How large are the Village Creek renovations?
The clinic renovation is listed at 3,098 square feet, and the surgery center renovation at 3,823 square feet.
What is being renovated near Geaux Plano in Plano?
At 1308 Village Creek Dr, about 220 meters from Geaux Plano at 5172 Village Creek Dr, TDLR records list interior renovations for Village Creek Clinic and Village Creek Surgery Center.
Also being built nearby
All of 75093- 5172 Village Creek Dr · Geaux Plano, LLCJun 11, 2026Luminate office remodel — renovation/alteration — demolition of an interior wall to create a larger open work space. new floor and paint in some areas. restroom remodeling · 220 m away
- 5916 Mossbrook TrlSep 4, 2025Install condenser & coil · 254 m away
- 5912 Mossbrook TrlDec 11, 2025Whole home water repipe · 254 m away
- 5217 Village Creek Drive · 5217 Village Creek Drive Owner LLCMar 3, 2025Dallas addiction center - interior renovation - phase 3 — renovation/alteration — the project encompasses the phase 3 renovation of the building. upon completion, the renovation portion will function as a 52-bed residential treatment facility · 307 m away
- 5217 Village Creek · 5217 Village Creek Drive Owner LLCFeb 26, 2024Dallas addiction center - interior renovation - phase 1 — renovation/alteration — the project encompasses the interior renovation of a portion of the existing building. the renovated area will serve as a 10-bed detox and residential treatment facility and will be an i-1 facility · 307 m away
- 5152 Village Creek Dr · Avant Ventures LLCOct 16, 2025Dr agarwal — renovation/alteration — interio remodel of office space to be made into a deratology office · 345 m away
- 5839 Willow Wood LnJan 7, 2026Repair of main gas line · 348 m away
- 5831 Willow Wood LnAug 22, 2026Reroof · 353 m away
- 5827 Willow Wood LnApr 30, 2026?replace the main electrical panel that is original to the home and is showing signs of “electrical cancer” with the panel replacement we would install;? new whole home grounding system to meet current nec code requirements (supplemental & intersystem bonding bridge)? new 200amp 40 space electrical panel with main breaker (lifetime warranty from manufacturer)? new 200amp meter/main service disconnect on the outside of home? slip fit coupling on main service conduit? extend existing cold water bonding wire to the outside disconnect? tier 3 surge protector with whole home power conditioner (10 year/ $2,500 per device manufacturer’s connected equipment warranty)? label all circuits in panel accordingly? install gfci protection to the bathrooms and outdoor outlets · 356 m away
- 5819 Willow Wood LnNov 2, 2026Re-roof · 362 m away
- 5511 Autumn WayMay 26, 2026Replacing 50 gallon gas water heater · 377 m away
- 5820 Willow Wood LnAug 17, 2026Replacing a 200a electrical panel, 200a meter base, adding a first responders disconnect, & adding a surge protector. old panel is a challenger and the insurance is making them change it · 381 m away