100 S Station St
Port Aransas, TX 78373 · Central Kitchen & Fine Arts Instructional Space, Port Aransas ISD Art Lab Renovation
Port Aransas High School additions include auditorium and kitchen
Port Aransas ISD is adding an 800-seat auditorium, central kitchen and dining area, band hall, and drama classroom at 100 S Station St. The TDLR project registration was filed May 14, 2024, and lists 31,000 square feet and an applicant-estimated project cost of $18.5 million. The registration status is inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated May 14, 2024
- Projects
- 2
- 2 filings
- Latest filing
- May 14, 2024
- since May 14, 2024
- Largest scope
- 31,000 sf
- Estimated cost
- $19M
- state registration
Where this project stands
Inspected · closing outCentral Kitchen & Fine Arts Instructional Space
31,000 sq ft · $19M est.
- RegisteredMay 14, 2024
- Plan review
- ConstructionJun '24 – Oct '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsConstruction of an 800 seat auditorium, central kitchen & dining, band hall, & drama classroom. — port aransas high school
TDLR project registrationAdditions to Existing BuildingInspection Complete31,000 sq ft$19M est.- Project #
- TABS2024018451
- Tenant / owner
- Central Kitchen & Fine Arts Instructional Space
- Design firm
- Pro
- Contact
- Pro
Enclose existing patio. new paint, floors, electrical ,and roof structure. windows and hvac — art lab
TDLR project registrationRenovation/AlterationProject Closed750 sq ft$300K est.- Project #
- TABS2023014171
- Tenant / owner
- Port Aransas ISD Art Lab Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 100 S Station St
What is being built at 100 S Station St in Port Aransas?
The Port Aransas High School project includes an 800-seat auditorium, central kitchen and dining area, band hall, and drama classroom. The TDLR registration was filed May 14, 2024.
Is Port Aransas High School getting a new auditorium?
The project registration describes construction of an 800-seat auditorium as part of additions to the existing school. Its listed status is inspection complete.
How much will the Port Aransas High School project cost?
The TDLR registration lists an applicant-estimated cost of $18.5 million for the project. The registration also lists 31,000 square feet.
When was the Port Aransas High School project permitted?
The project was registered with TDLR on May 14, 2024. The record identifies it as additions to an existing building.
What is being built near the City of Port Aransas on Ninth Street?
About 392 meters from the City of Port Aransas landmark, the Port Aransas High School project includes an auditorium, kitchen and dining area, band hall, and drama classroom. The project address is 100 S Station St.
Is the Port Aransas High School construction complete?
The TDLR project registration lists its status as inspection complete. It does not provide a construction completion date.
Also being built nearby
All of 78373- 113 South Alister Street · Community Presbyterian Church Of Port AransasJan 23, 2024Community presbyterian church of port aransas — new construction — new construction of three (3) separate buildings. the sanctuary building (approximately: 3,997 sq ft). the jelm building (approximately: 3,029 sq ft). the food pantry building (approximately: 1,911 sq ft) · 290 m away
- 415 Ninth St · City Of Port AransasJan 13, 2025City of port aransas - public works facility — new construction — 6,500 sq ft, single-story office and shop building · 392 m away
- 206 W Avenue A · Scarbrough Coastal LLCMar 26, 2025Surf shack — new construction — single story wood frame structure on pilings to be used for retail and beverage sales · 408 m away
- 415 S. Allister Street · Deep Splash, INCApr 16, 2025Candy shop — renovation/alteration — create a candy store from existing retail space · 431 m away
- 408 North Alister · City Of Port AransasNov 18, 2024Copa-community center renovations & park restroom addition — renovation/alteration — finishes renovations to the existing community center and addition of two stand alone accessible restrooms, ramps and stairs · 586 m away