695 FM-120
Pottsboro, TX 75076 · Ameristate Bank
Ameristate Bank remodel planned at 695 FM-120
An existing 3,008-square-foot bank at 695 FM-120 was registered for renovation on July 20, 2024, as Ameristate Bank. The project description says the use will remain a bank and the work is primarily cosmetic; the TDLR-listed project estimate is $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 20, 2024
- since Jul 20, 2024
- Largest scope
- 3,008 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Inspected · closing outAmeristate Pottsboro
3,008 sq ft · $1.0M est.
- RegisteredJul 20, 2024
- Plan review
- ConstructionJun '23 – Jun '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectExisting bank location remodeled for a new owner. same use applies and construction primarily involved cosmetic upgrades. new bank is called ameristate bank. — ameristate bank
TDLR project registrationRenovation/AlterationInspection Complete3,008 sq ft$1.0M est.- Project #
- TABS2024023500
- Tenant / owner
- Ameristate Pottsboro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 695 FM-120
What is being built at 695 FM-120 in Pottsboro?
The existing bank location is being remodeled for Ameristate Bank, with the same bank use continuing. The TDLR registration describes the work as primarily cosmetic.
Is Ameristate Bank opening at 695 FM-120?
A TDLR project registration describes the existing bank location as remodeled for a new owner and names Ameristate Bank. The registration does not state an opening date.
When was the 695 FM-120 bank remodel registered?
The project was registered on July 20, 2024. Its TDLR number is TABS2024023500.
How large is the Ameristate Bank project in Pottsboro?
The registered project covers 3,008 square feet. TDLR lists an estimated project cost of $1 million.
Is the project at 695 FM-120 a new bank or a remodel?
It is described as a remodel of an existing bank location for a new owner, with the same use continuing. The TDLR registration lists the project type as renovation/alteration.