groundranger
Active · latest filing Oct 2026Commercial

120 Red River Rd N

Redwater, TX 75573 · Redwater ISD

Redwater plans to replace Dragon Stadium’s track and football field

A TDLR project registration filed October 23, 2026, describes replacing the existing track and football field at Dragon Stadium, 120 Red River Rd N, with new facilities. The registration lists an applicant-estimated project cost of $3 million and is marked “Review Complete.”

Summarized from Texas Department of Licensing and Regulation records · updated Oct 23, 2026

Projects
1
1 filings
Latest filing
Oct 23, 2026
since Oct 23, 2026
Largest scope
150,000 sf
Estimated cost
$3.0M
state registration

Where this project stands

Approved · construction starts Dec 1, 2026

Redwater Track and Field Replacement

150,000 sq ft · $3.0M est.

  1. RegisteredOct 23, 2026
  2. Plan review
  3. ConstructionDec '26 – Apr '27
  4. Inspected
  5. Closed

A 4-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Replacement of an existing track and football field with new. — dragon stadium

    TDLR project registrationRenovation/AlterationReview Complete150,000 sq ft$3.0M est.
    Tenant / owner
    Redwater Track And Field Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 120 Red River Rd N

What is being built at 120 Red River Rd N in Redwater?

A project registration describes replacing Dragon Stadium’s existing track and football field with new facilities. It was filed October 23, 2026, under TDLR project number TABS2027004302.

Is Dragon Stadium getting a new track and football field?

The TDLR registration describes replacement of the existing track and football field with new facilities. It does not provide a construction timeline.

How much will the Redwater track and field replacement cost?

The TDLR registration lists an applicant-estimated cost of $3 million for the project. This is an estimate, not a reported final cost.

When was the Dragon Stadium replacement project filed?

The project registration was filed October 23, 2026. Its status is listed as “Review Complete.”

What is the TDLR number for the Redwater stadium project?

The TDLR project number is TABS2027004302. The registration describes replacing the existing track and football field at Dragon Stadium.

Email me when construction starts