300 Gateway Pkwy
Roanoke, TX 76262 · 3m Corporation
High-pile storage added at 3M's Roanoke warehouse
A high-pile storage racking addition is planned inside the existing warehouse at 300 Gateway Pkwy in Roanoke. The project was registered with the Texas Department of Licensing and Regulation on September 22, 2026; the registration says it does not change the building's occupancy, area, height or number of stories.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2026
- since Sep 22, 2026
- Largest scope
- 612,270 sf
- Estimated cost
- $770K
- state registration
Where this project stands
In state plan review3M - Roanoke Highpile Storage Racking addition
612,270 sq ft · $770K est.
- RegisteredSep 22, 2026
- Plan reviewnow
- ConstructionNov '26 – Apr '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project provides additional high-pile storage within an existing warehouse. the conversion does not represent a change of occupancy or propose modification to the existing building area, height or number of stories. — 3m warehouse
TDLR project registrationRenovation/AlterationProject Registered612,270 sq ft$770K est.- Project #
- TABS2027001644
- Tenant / owner
- 3m - Roanoke Highpile Storage Racking Addition
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 300 Gateway Pkwy
What is being built at 300 Gateway Pkwy in Roanoke?
A TDLR project registration describes additional high-pile storage racking inside the existing 3M warehouse. It does not describe a new building.
When was the 3M warehouse storage project registered?
The project was registered on September 22, 2026. Its TDLR registration number is TABS2027001644.
Is the warehouse at 300 Gateway Pkwy being expanded?
The registration says the work does not modify the building's existing area, height or number of stories. It describes added high-pile storage within the warehouse.
How much will the 3M storage project cost?
The TDLR registration lists an estimated project cost of $770,000. This is the applicant's estimate.
What is happening near 501 Gateway Parkway in Roanoke?
The nearby project at 300 Gateway Pkwy is a high-pile storage racking addition inside an existing warehouse. It was registered with TDLR on September 22, 2026.
Is a new warehouse being built at 300 Gateway Pkwy?
The project record describes a storage addition within an existing warehouse, not new warehouse construction. It says the work does not change the building's occupancy or dimensions.
Also being built nearby
All of 76262- 300 Gateway Parkway · 3m WarehouseApr 2, 20253m cold room racking — additions to existing building — installation of pallet racking (high pile storage) 9,186 sq ft
- 501 Gateway Parkway · Alliance Gateway No. 88, LtdMar 13, 202626026 - alliance gateway 88 - stair — renovation/alteration — this project consist of the demolition of an existing spiral staircase and the construction of a standard staircase in its place · 13 m away
- 400 Patriot Parkway · Nr Alliance Gateway 62, LLCMay 23, 2024E distribution roanoke tx rack installation — renovation/alteration — relocation of storage racks from the left side of facilitiy to the right side of the facility. installation of new storage racks to the left side of the facility · 212 m away
- 701 Gateway Parkway · Behr Process CorporationJul 15, 2025Behr process corporation warehouse addition — additions to existing building — 75,000 sq ft addition to the current warehouse. tilt-up wall construction, minor paving work. construction of warehouse toilet room and plumbing fixture replacement in the current warehouse unisex toilet room. no new parking or sidewalks · 219 m away
- 401 Highway 377 · Argyle 401 LPMar 11, 2024Little joe's — renovation/alteration — renovation of an existing gas station/restaurant into a new restaurant · 498 m away
- 409 South US 377 · Cdi 60 Hawk LLCJan 16, 2026Argyle marsden building 300 — new construction — a new shell building for business and mercantile · 500 m away
- 415 South US 377 · Cdi Adp LLCSep 23, 2024Colo office space — renovation/alteration — renovation of existing lease space · 501 m away
- 102 South US 377 · City Of RoanokeOct 10, 2025Roanoke main street parking garage — new construction — new construction of a 5 story (150,00 sq ft) open-air parking garage · 502 m away
- 499 South US 377 · Cdi 60 Hawk LLCJan 16, 2026Argyle marsden building 100 — new construction — a new commercial strip building for office and mercantile · 521 m away
- 307 South Oak St · Lynba HoldingsFeb 19, 2026Proposed shell restaurant | office development — new construction — two story shell restaurant (first floor), and shell offices (second floor) · 557 m away
- 310 S. Oak Street · Three Ten Oak LLCNov 13, 2025Three ten oak renovations — renovation/alteration — interior office renovation · 568 m away
- 200 S Oak St · Pirate Panda BrewingJun 29, 2026Pirate panda brewing — new construction — new construction of a 5,600 sq ft brewery and taproom with an upper level mezanine and outdoor seating · 576 m away