groundranger
Historic · latest filing May 2025Commercial

201 S Fulton Beach Rd

Rockport, TX 78382 · Boiling Pot

Boiling Pot adds 400 square feet of bathrooms in Rockport

A 400-square-foot addition for men’s and women’s bathrooms is planned at the existing Boiling Pot building at 201 S Fulton Beach Rd. The project was registered with TDLR on May 28, 2025, and its status is listed as inspection complete.

Summarized from Texas Department of Licensing and Regulation records · updated May 28, 2025

Projects
1
1 filings
Latest filing
May 28, 2025
since May 28, 2025
Largest scope
400 sf
Estimated cost
$70K
state registration

Where this project stands

Inspected · closing out

Boiling Pot Bathroom Additions

400 sq ft · $70K est.

  1. RegisteredMay 28, 2025
  2. Plan review
  3. ConstructionJun '25 – Mar '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Add 400 sq ft mens/womens bathrooms to existing building — boiling pot

    TDLR project registrationAdditions to Existing BuildingInspection Complete400 sq ft$70K est.
    Tenant / owner
    Boiling Pot Bathroom Additions
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 201 S Fulton Beach Rd

What is being built at 201 S Fulton Beach Rd in Rockport?

A 400-square-foot addition containing men’s and women’s bathrooms is listed for the existing Boiling Pot building.

When was the Boiling Pot bathroom addition filed?

The TDLR project registration was filed on May 28, 2025. The record lists the project as inspection complete.

How big is the bathroom addition at Boiling Pot?

The TDLR record lists the addition as 400 square feet.

How much is the Boiling Pot bathroom project estimated to cost?

The TDLR record lists an estimated project cost of $70,000.

Is the Boiling Pot bathroom addition complete?

The TDLR record lists its status as inspection complete.

What is the TDLR number for the Boiling Pot addition?

The project registration is TABS2025019932, filed May 28, 2025.

Email me when the project is closed