CC Carpet interior finish-out filed for 1915 Alpha Drive

A 918-square-foot, non-structural interior finish-out for CC Carpet in an existing single-floor suite was registered on September 25, 2024. The TDLR record, project TABS2025001796, lists an applicant-estimated project cost of $204,725.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 25, 2024

Projects
1
1 filings
Latest filing
Sep 25, 2024
since Sep 25, 2024
Largest scope
918 sf
Estimated cost
$205K
state registration

Where this project stands

Finishing up · inspection next

CC Carpet

918 sq ft · $205K est.

  1. RegisteredSep 25, 2024
  2. Plan review
  3. ConstructionSep '24 – Mar '25
  4. Inspectednow
  5. Closed

Scheduled to finish Mar 25, 2025; the state inspection hasn't been filed yet.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. CC Carpet

    A non-structural interior finish out in an existing single floor suite. — rockwall urban + industrial center

    TDLR project registrationRenovation/AlterationReview Complete918 sq ft$205K est.
    Tenant / owner
    Cc Carpet
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1915 Alpha Drive

What is being built at 1915 Alpha Drive in Rockwall?

The TDLR record describes a 918-square-foot, non-structural interior finish-out for CC Carpet in an existing single-floor suite. It was registered September 25, 2024, under project TABS2025001796.

Is 1915 Alpha Drive a new building?

The record describes interior work in an existing single-floor suite, not new construction.

What is the project cost for 1915 Alpha Drive?

The TDLR registration lists an applicant-estimated cost of $204,725 for the project.

When was the CC Carpet project at 1915 Alpha Drive filed?

The project was registered with the Texas Department of Licensing and Regulation on September 25, 2024.

What is happening near QA Logistics Rockwall on Alpha Drive?

At 1915 Alpha Drive, the TDLR record describes a 918-square-foot interior finish-out for CC Carpet in an existing suite. The registration is dated September 25, 2024.