2300 Greenlawn Boulevard
Round Rock, TX 78664 · Lobby Desk Update - Rr3, Rr3-1 Lobby Vestibule Upgrades + 1 more
Lobby and entrance upgrades at a multi-tenant building
TDLR registrations indicate lobby and entrance renovations at the multi-tenant building at 2300 Greenlawn Boulevard. Registered February 12 and March 12, 2024, the work includes updating access control at a building entrance and replacing a reception desk with related casework and new power and data drops. A separate 2023 registration covers an interior remodel in part of the existing building.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 12, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Mar 12, 2024
- since Feb 12, 2024
- Largest scope
- 608 sf
- Estimated cost
- $242K
- state registration
Where this project stands
CompletedLobby Desk Update - RR3
256 sq ft · $200K est.
- RegisteredMar 12, 2024
- Plan review
- ConstructionJun '24 – Jul '24
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsReplacement of reception desk including related casework and new power and data drops. — rr3
TDLR project registrationRenovation/AlterationProject Closed256 sq ft$200K est.- Project #
- TABS2024013619
- Tenant / owner
- Lobby Desk Update - Rr3
- Design firm
- Pro
- Contact
- Pro
Updating access control at building 3 entrance — rr3
TDLR project registrationRenovation/AlterationReview Complete608 sq ft$60K est.- Project #
- TABS2024011353
- Tenant / owner
- Rr3-1 Lobby Vestibule Upgrades
- Design firm
- Pro
- Contact
- Pro
Interior remodel in a portion of existing building — building 3
TDLR project registrationRenovation/AlterationProject Closed1,090 sq ft$242K est.- Project #
- TABS2023016494
- Tenant / owner
- Dell Rr3-1 Fed Services And Mailroom
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2300 Greenlawn Boulevard
What is being built at 2300 Greenlawn Boulevard?
TDLR registrations describe renovations in a multi-tenant building, including lobby desk replacement and entrance access-control upgrades. They also record an interior remodel in part of the building in 2023.
When were the lobby and entrance upgrades registered?
The entrance access-control project was registered February 12, 2024 (TABS2024011353). The lobby desk replacement was registered March 12, 2024 (TABS2024013619).
What work is planned for the lobby at 2300 Greenlawn Boulevard?
The March 12, 2024 TDLR registration describes replacing a reception desk, related casework, and adding power and data drops. The project is listed as closed.
Are the renovations at 2300 Greenlawn Boulevard for the whole building?
The records describe specific work in a multi-tenant building, including lobby and entrance upgrades and an interior remodel in a portion of the existing building. They do not describe a renovation of the entire building.
What is happening near Dell in Round Rock?
At 2300 Greenlawn Boulevard, TDLR registrations describe lobby desk replacement and entrance access-control upgrades in a multi-tenant building. The registrations are dated February 12 and March 12, 2024.
Also being built nearby
All of 78664- 2300 Greenlawn Blvd · Dell Inc.Aug 4, 2025Dell - rr3 csc showcase expansion — renovation/alteration — interior renovation removing conference rooms to create a larger innovation center showroom
- 1951 Hampton Lane · Islamic Center Of Round RockFeb 11, 2026Islamic center of round rock new worship assembly — new construction — 15,300 sq ft religious assembly with two floors and elevator access · 237 m away
- 501 Dell WayFeb 3, 2026Project milkweed — renovation/alteration — relocating of an existing lab, the addition of a new electrical room, and the remodel of a server room · 423 m away
- 2401 Greenlawn Blvd · Dell Computer Holdings LPJun 26, 2026Rr8-1 eerc 2 — renovation/alteration — interior remodel to install new server equipment within an existing building, with limited exterior work for new mechanical and electrical equipment · 433 m away
- 401 Dell WayAug 27, 2025Dell rr1 studio expansion — renovation/alteration — interior renovation of studio and offices to expand studio including finishes, mechanical, and electrical · 574 m away
- 401 Dell Way Rr1, SecondMar 11, 2024Rr1 boardroom video wall — renovation/alteration — replacement of existing a/v equipment and finish materials. limited modifications to mechanical, electrical, and low voltage system required for installation of new a/v equipment · 574 m away