groundranger
Recent · latest filing Feb 2026Commercial

900 Louis Henna Blvd

Round Rock, TX 78664 · Circle-K Stores Inc.

Circle K remodel and new diesel canopy in Round Rock

A remodel and site expansion of the existing 5,881-square-foot Circle K at 900 Louis Henna Blvd. was registered with TDLR on February 13, 2026. The proposal includes a 1,248-square-foot diesel canopy with three fuel pumps and a new dumpster enclosure. The applicant estimated the project cost at $1.5 million; the registration is marked review complete.

Summarized from Texas Department of Licensing and Regulation records · updated Feb 13, 2026

Projects
1
1 filings
Latest filing
Feb 13, 2026
since Feb 13, 2026
Largest scope
5,881 sf
Estimated cost
$1.5M
state registration

Where this project stands

Under construction

Circle-K Round Rock, TX (900 Louis Henna Blvd.)

5,881 sq ft · $1.5M est.

  1. RegisteredFeb 13, 2026
  2. Plan review
  3. ConstructionAug '26 – Dec '26
  4. Inspected
  5. Closed
74% through of a 4-month buildAug 10, 2026 → Dec 24, 2026

4 contacts on this project · 4 phone numbers

Permit & project history

1 project
  1. Proposal for a building remodel and site expansion of an existing 5,881 s.f. circle-k convenience store with a new 1,248 sq ft diesel canopy with 3 fuel pumps and a new cmu dumpster enclosure. — circle-k round rock, tx (900 louis henna blvd.)

    TDLR project registrationRenovation/AlterationReview Complete5,881 sq ft$1.5M est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 900 Louis Henna Blvd

What is being built at 900 Louis Henna Blvd. in Round Rock?

A TDLR registration proposes remodeling and expanding the existing Circle K, including a 1,248-square-foot diesel canopy with three fuel pumps and a new dumpster enclosure. The registration is TABS2026012588, filed February 13, 2026.

Is a new Circle K opening at 900 Louis Henna Blvd.?

The filing describes work at an existing 5,881-square-foot Circle K, not a new store. It proposes a remodel and site expansion.

Is Circle K adding diesel pumps on Louis Henna Boulevard?

The proposal includes a new diesel canopy with three fuel pumps at 900 Louis Henna Blvd. The TDLR registration was filed February 13, 2026.

What is planned next to QuikTrip #4137 at 901 Louis Henna Blvd.?

At 900 Louis Henna Blvd., the existing Circle K is proposed for a remodel and site expansion, including a diesel canopy with three pumps. The QuikTrip project is at 901 Louis Henna Blvd.

How much will the Circle K project in Round Rock cost?

The TDLR filing lists an applicant estimate of $1.5 million for the project. This is an estimate, not a confirmed final cost.

Has the 900 Louis Henna Blvd. project been approved?

The TDLR registration, TABS2026012588, is marked review complete. The filing describes a proposed remodel and site expansion.

Also being built nearby

All of 78664

More gas stations & car washes in 78664, retail spaces in 78664.

Email me when it passes inspection