201 Seton Pkwy
Round Rock, TX 78665 · Ascension Seton Williamson Cath Lab, Ascension Seton Williamson Exapansion
Hospital expansion and cath lab renovation at 201 Seton Pkwy
A 225,000-square-foot addition and renovations at the multi-tenant medical site, including a six-floor tower and work on hospital departments, were registered with TDLR on August 27, 2024. A separate 599-square-foot renovation of existing cath lab 4 was registered on October 24, 2024; the applicant estimated the larger project would cost $135 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 24, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Oct 24, 2024
- since Aug 27, 2024
- Largest scope
- 225,000 sf
- Estimated cost
- $135M
- state registration
Where this project stands
CompletedAscension Seton Williamson Cath Lab
599 sq ft · $500K est.
- RegisteredOct 24, 2024
- Plan review
- ConstructionDec '24 – Jul '25
- Inspected
- Closed
Ran as a 7-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projects599 sq ft renovation of existing cath lab 4 at ascension seton williamson hospital. this includes replacing equipment and flooring and ceiling to install new mep/structural infrastructure. — ascension seton williamson hospital
TDLR project registrationRenovation/AlterationProject Closed599 sq ft$500K est.- Project #
- TABS2025003973
- Tenant / owner
- Ascension Seton Williamson Cath Lab
- Design firm
- Pro
- Contact
- Pro
225,000 sq ft addition and renovations to ascension seton williamson hospita - including a 6 floor tower, ed shell, imaging & cdu, or, cath lab, materials management, cup & dock expansion and renovation to the lab, pharmacy, dietary, endo and others. — ascension seton williamson hospital
TDLR project registrationAdditions to Existing BuildingInspection Complete225,000 sq ft$135M est.- Project #
- TABS2024026408
- Tenant / owner
- Ascension Seton Williamson Exapansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 201 Seton Pkwy
What is being built at 201 Seton Pkwy in Round Rock?
TDLR records describe a 225,000-square-foot addition and renovations at Ascension Seton Williamson Hospital, including a six-floor tower. The project was registered on August 27, 2024, under TABS2024026408.
Is the work at 201 Seton Pkwy a new hospital?
The TDLR registration describes an addition and renovations to the existing hospital, not a separate new hospital. The scope includes a six-floor tower and renovations to several hospital departments.
What is the estimated cost of the hospital expansion?
The applicant's TDLR estimate for the 225,000-square-foot addition and renovations is $135 million. This is an estimate for that project, not a reported total cost for all work at the address.
Is a cath lab being renovated at Ascension Seton Williamson Hospital?
Yes. A TDLR registration dated October 24, 2024, describes a 599-square-foot renovation of existing cath lab 4, including equipment, flooring, ceiling, and infrastructure work. The registration status is Project Closed.
What departments are included in the hospital expansion?
The registration lists emergency department shell space, imaging and CDU, operating room, cath lab, materials management, and central utility plant and dock expansion. It also notes renovations to the lab, pharmacy, dietary, and endoscopy areas, among others.
What's being built near Texas State University in Round Rock?
At 201 Seton Pkwy, about 332 meters from Texas State University's listed address, TDLR records describe a 225,000-square-foot addition and renovations to Ascension Seton Williamson Hospital. It was registered on August 27, 2024.
Also being built nearby
All of 78665- 201 Seton Parkway · Ascension Seton Williamson HospitalDec 11, 2024Asw women's center refresh — renovation/alteration — finish upgrades to existing women's center unit at asw hospital. upgrades include paint, wall coverings, and bathroom tile. upgrade also includes reconfiguration of 2 on-call rooms, combining into 1
- 1555 University Blvd · Texas State UniversityOct 31, 2024Esperanza hall — new construction — new classrooms & office space - concrete structure & steel, three level, level 2 is partially built out & level 3 is mixed occupancy · 332 m away
- 301 Seton Parkway · Ascension Seton Williamson Hospital - Medical PlazaDec 11, 2024Asw mob oakwood clinic renovation — renovation/alteration — renovation of existing office space and build-out of shell spaces at medical plaza building, 4th floor. renovation includes new work areas, restrooms, and exam rooms · 501 m away
- 301 Seton Pkwy · Lhpt Ascension Round Rock, LPJan 29, 2025Optum — renovation/alteration — interior remodel for medical office · 501 m away