655 Caddo
San Angelo, TX 76901 · Central High School New Addition - Pkg 2, New Controlled Lobby - San Angelo ISD
Central High School addition registered in San Angelo
A 155,000-square-foot new facility is planned for Central High School’s existing campus at 655 Caddo in San Angelo. The project was registered with the Texas Department of Licensing and Regulation on August 13, 2026. The registration describes a 1,000-seat auditorium, a 2,200-seat gymnasium, a cafeteria serving 1,000 students, and an expanded career and technical education program; the applicant’s estimated project cost is $109 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 13, 2026
- since Aug 13, 2026
- Largest scope
- 155,000 sf
- Estimated cost
- $109M
- state registration
Permit & project history
2 projectsProject consists of a new facility on an existing 40-acre high school campus. the new facility will include a 1,000 seat auditoriium, 2,200 seat gymnasium, a cafeteria serving 1,000 students, and expanding the cte program. — central high school
TDLR project registrationAdditions to Existing BuildingProject Registered155,000 sq ft$109M est.- Project #
- TABS2026027701
- Tenant / owner
- Central High School New Addition - Pkg 2
- Design firm
- Pro
- Contact
- Pro
Interior space renovation to provide a controlled lobby entry with aluminum storefront framing — central high school
TDLR project registrationRenovation/AlterationProject Closed1,000 sq ft$146K est.- Project #
- TABS2024000345
- Tenant / owner
- New Controlled Lobby - San Angelo ISD
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 655 Caddo
What is being built at 655 Caddo in San Angelo?
A new facility is planned for Central High School’s existing campus. The TDLR registration describes an auditorium, gymnasium, cafeteria, and expanded career and technical education program.
When was the Central High School addition registered?
The project was registered with the Texas Department of Licensing and Regulation on August 13, 2026, under project number TABS2026027701.
How large is the new Central High School facility?
The TDLR registration lists the planned facility at 155,000 square feet.
What will the Central High School addition include?
The registration describes a 1,000-seat auditorium, a 2,200-seat gymnasium, a cafeteria serving 1,000 students, and an expanded career and technical education program.
How much is the Central High School project expected to cost?
The applicant’s estimated cost in the TDLR registration is $109 million.
Also being built nearby
All of 76901- 655 Caddo Street · San Angelo Independent School DistrictFeb 20, 2024San angelo isd sousa building renovation — renovation/alteration — renovation of it offices into classroom and gang restroom
- 655 Caddo St · San Angelo ISDMay 5, 2025High school culinary renovation — renovation/alteration — renovation of the san angelo isd high school culinary (1,732sf)
- 302 Cottonwood St · San Angelo Independent School DistrictMay 31, 2024San angelo central high school portable classrooms — renovation/alteration — renovation of (4) existing portable classroom buildings to the central high school campus · 332 m away