2030 S Alamo St
San Antonio, TX 78204 · Legacy L Z Investments INC
April’s Chinese Restaurant renovation planned at 2030 S Alamo
A 1,791-square-foot renovation for April’s Chinese Restaurant is planned at 2030 S Alamo St. The project was registered with the Texas Department of Licensing and Regulation on October 20, 2025. The registration lists an applicant-estimated project cost of $325,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 20, 2025
- since Oct 20, 2025
- Largest scope
- 1,791 sf
- Estimated cost
- $325K
- state registration
Where this project stands
Finishing up · inspection nextAprils Chinese Restaurant
1,791 sq ft · $325K est.
- RegisteredOct 20, 2025
- Plan review
- ConstructionFeb '26 – May '26
- Inspectednow
- Closed
Scheduled to finish May 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemove existing exterior finishes and replace interior- remodel restrooms, replace walls as needed, new flooring, paint and new lighting. 1791 sq ft — aprils chinese restaurant
TDLR project registrationRenovation/AlterationReview Complete1,791 sq ft$325K est.- Project #
- TABS2026003750
- Tenant / owner
- Aprils Chinese Restaurant
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2030 S Alamo St
What is being built at 2030 S Alamo St in San Antonio?
A renovation for April’s Chinese Restaurant is planned at the address. The registered work includes replacing exterior finishes, remodeling restrooms, replacing walls as needed, and installing new flooring, paint and lighting.
Is a new restaurant opening at 2030 S Alamo St?
The TDLR registration describes renovation work for April’s Chinese Restaurant. It does not state an opening date.
When was the April’s Chinese Restaurant project registered?
The project was registered on October 20, 2025. Its TDLR project number is TABS2026003750.
How large is the renovation at 2030 S Alamo St?
The registered project covers 1,791 square feet.
How much is the April’s Chinese Restaurant renovation estimated to cost?
The applicant’s TDLR estimate for the project is $325,000.
What is being renovated near Mithril Holdings on S Alamo?
A 1,791-square-foot renovation for April’s Chinese Restaurant is registered at 2030 S Alamo St, about 393 meters from Mithril Holdings at 1108 S. Flores.
Also being built nearby
All of 78204- 1108 S. Flores · Mithril Holdings LLCJul 30, 2024S flores warehouse rehab — renovation/alteration — interior addition of restrooms and cosmetic work throughout · 393 m away
- 207 W Cevallos St · Bota Partners, LLCMar 13, 2025Dark hive — renovation/alteration — hvac system repair, replacement of entry openings, modifications for accessibility (restrooms and entry), replacement of select finishes and fixtures · 443 m away
- 1334 S Flores St · Sf Commercial LPFeb 11, 2026South flores riser room and roof — additions to existing building — convert southeast restroom into fire riser room for sprinkler risers & valves. add new exterior door with concrete steps & metal handrails for fire dept. access. replace metal roof with 18” metal panels per ohp coa. no change to occupancy · 451 m away
- 1400 S. Flores Street · Design International, LLCSep 17, 2026#26080 - core office interiors - suite 101 finish out — renovation/alteration — 6,350 sq ft interior finish-out of an existing shell space · 496 m away
- 1400 South Flores Street · Design International, LLCJan 8, 2025#24108 - core office interiors — new construction — interior finish-out of an existing shell space. cad #1115730 · 496 m away
More restaurants in 78204.