7322 Jones Maltsberger Rd Space 114
San Antonio, TX 78209 · Aat Alamo Quarry LLC
GAP interior upgrades registered at Quarry Crossing
A 13,477-square-foot renovation is planned for the existing GAP retail space at Quarry Crossing, including cosmetic upgrades, monitors, lit signage and feature millwork. The Texas Department of Licensing and Regulation registration was filed May 8, 2026, with an applicant-estimated project cost of $360,000.
Summarized from Texas Department of Licensing and Regulation records · updated May 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 8, 2026
- since May 8, 2026
- Largest scope
- 13,477 sf
- Estimated cost
- $360K
- state registration
Where this project stands
Under constructionGAP #9010 Quarry Crossing - San Antonio, TX
13,477 sq ft · $360K est.
- RegisteredMay 8, 2026
- Plan review
- ConstructionAug '26 – Feb '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectCosmetic upgrades, addition of monitors, lit signage and feature millwork elements, within an existing retail tenant. no structural, mechanical or plumbing included. — quarry crossing
TDLR project registrationRenovation/AlterationReview Complete13,477 sq ft$360K est.- Project #
- TABS2026019838
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7322 Jones Maltsberger Rd Space 114
What is being built at 7322 Jones Maltsberger Road?
A renovation is planned for the existing GAP retail space, including cosmetic upgrades, monitors, lit signage and feature millwork. The TDLR registration was filed May 8, 2026.
Is a new GAP store opening at Quarry Crossing?
The registration describes upgrades within an existing retail tenant, not a new store. It does not give an opening date.
What work is planned at GAP #9010 in San Antonio?
The project registration lists cosmetic upgrades, monitors, lit signage and feature millwork. It says no structural, mechanical or plumbing work is included.
How much will the GAP renovation at Quarry Crossing cost?
The applicant estimated the project cost at $360,000 in the TDLR registration filed May 8, 2026.
What is being renovated near Face Foundrie on East Basse Road?
An existing GAP retail space at 7322 Jones Maltsberger Road is registered for interior upgrades. Face Foundrie is listed about 112 meters away.
What is changing near Sephora at Quarry Crossing?
The planned GAP renovation includes cosmetic upgrades, monitors, lit signage and feature millwork. Sephora is listed about 250 meters away.
Also being built nearby
All of 78209- 7322 Jones Maltsberger Road · Alamo Quarry MarketMay 20, 2025Carhartt - san antonio — renovation/alteration — interior build-out of a mercantile space contained within an existing shopping center. proposed work includes construction and installation of new non-load bearing partitions, fixtures, finishes, lighting, mechanical, electrical, and plumbing
- 320 E Basse Road · US Reif Artessa San Antonio Tx, Llc.Dec 9, 2025Face foundrie — renovation/alteration — interior tenant improvement of an existing space into a face foundrié. new partition walls, finishes, mechanical, plumbing, and electrical for new equipment and fixtures. no exterior or site modifications, and existing parking to remain unchanged · 112 m away
- 555 E. Basse Road · 1251 Austin Highway LPJul 7, 2026Toroko sushi — renovation/alteration — remodel the interior of an existing commercial suite at approximately 1503 sq ft, includes new floor, walls, doors, lights, and paint · 200 m away
- 255 E Basse Rd · Aat Alamo Quarry LLCMay 6, 2026Coach — renovation/alteration — new interior non bearing walls, sales and stock room shelving, mechanical, electrical, plumbing work. new interior finishes · 250 m away
- 255 E. Basse Road · Aat Alamo Quarry LLCApr 20, 2026Alamo quarry market parking lot repaving and restriping — renovation/alteration — portion of parking lot repaving and restriping · 250 m away
- 255 E. Basse Rd., Space · Aat Alamo Quarry, LLCJan 11, 2026Sephora — renovation/alteration — work includes new and relocated sales floor fixtures, floor finish replacement and minor elextrical · 250 m away
- 255 East Basse Road · Alamo Quarry MarketNov 25, 2025Alam quarry theater alterations — renovation/alteration — interior upgrades · 250 m away
- 250 E. Basse Road · Bsf1 Alamo, LLCOct 23, 2026Methodist physician practice services, llc — renovation/alteration — renovation of an existing tenant finish out · 358 m away
- 250 E Basse · Bsf1 Alamo, LLCJul 14, 2025Suites 107 & 108 — renovation/alteration — interior renovation · 358 m away
- 250 East Basse Road · Bsf1 Alamo, LLCSep 3, 2025Vivo infusion — renovation/alteration — tenant finish-out · 358 m away
More retail spaces in 78209.