1310 Mccullough Ave
San Antonio, TX 78212 · Methodist Healthcare System Of San Antonio Ltd Llp
Emergency department renovation registered at Methodist Metropolitan
An interior renovation of the existing emergency department at 1310 McCullough Ave is planned, including waiting, triage, exam and treatment, and support spaces. The project was registered with TDLR on October 20, 2026, as project TABS2027003980. The applicant estimates the project cost at $3.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 20, 2026
- since Oct 20, 2026
- Largest scope
- 5,000 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
In state plan reviewMethodist Metropolitan Emergency Dept Renovation
5,000 sq ft · $3.5M est.
- RegisteredOct 20, 2026
- Plan reviewnow
- ConstructionDec '26 – Sep '27
- Inspected
- Closed
Construction is scheduled to start Dec 15, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovation of an existing hospital emergency department including waiting, triage, exam/treatment and support spaces, with architectural, mechanical, plumbing/medical gas, electrical and life-safety modifications. — methodist hospital metropolitan
TDLR project registrationRenovation/AlterationProject Registered5,000 sq ft$3.5M est.- Project #
- TABS2027003980
- Tenant / owner
- Methodist Metropolitan Emergency Dept Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1310 Mccullough Ave
What is being built at 1310 McCullough Ave in San Antonio?
The project is an interior renovation of Methodist Hospital Metropolitan’s existing emergency department, including waiting, triage, exam and treatment, and support spaces. It was registered with TDLR on October 20, 2026, as TABS2027003980.
Is a new hospital being built at 1310 McCullough Ave?
The TDLR registration describes renovation of an existing hospital emergency department, not construction of a new hospital. The project covers about 5,000 square feet.
How much will the Methodist Metropolitan emergency department renovation cost?
The applicant’s estimated cost is $3.5 million. This is an estimate for the project, not a confirmed final cost.
When was the emergency department renovation registered?
The project was registered with the Texas Department of Licensing and Regulation on October 20, 2026. Its registration number is TABS2027003980.
What work is planned inside the emergency department?
The registration lists work in waiting, triage, exam and treatment, and support spaces, along with architectural, mechanical, plumbing and medical-gas, electrical, and life-safety modifications.
What is being renovated near Methodist Hospital Metropolitan Bed & Cath Expansion?
At the same address, 1310 McCullough Ave, a separate TDLR registration describes an interior renovation of the existing emergency department. It was registered on October 20, 2026, under TABS2027003980.
Also being built nearby
All of 78212- 1310 Mccullough Avenue 1310 Mccullough Avenue · Methodist Hospital MetropolitanApr 1, 2025Methodist hospital metropolitan surgery renovation — renovation/alteration — renovation of the existing acc building first floor surgery department
- 410 Ogden Street 1310 Mccullough Avenue · Methodist Hospital MetropolitanApr 1, 2025Methodist hospital metropolitan parking garage — new construction — new 6-level parking garage
- 1310 Mccullough Avenue 1310 Mccullough Avenue · Methodist Hospital MetropolitanMar 10, 2026Methodist hospital metropolitan bed & cath expansion — additions to existing building — two story vertical expansion and interior renovation
- 1310 Mccullough Avenue · Methodist Hospital MetropolitanFeb 14, 2025Pre-admission testing (pat) suite renovation — renovation/alteration — renovate existing office spaces and convert to 4 assessment rooms, nurse workstation, toilet, and other support spaces
- 1303 Mccullough Avenue · Methodist Healthcare System Of San Antonio, Ltd., Llp Dba Metropolitan Professional BuildingOct 22, 2026Saga metro asc — new construction — finish out of an ambulatory surgery in an existing medical office building · 15 m away
- 401 E Laurel · Methodist Healthcare System Of San Antonio, LtdMay 8, 2025Mmh parking — renovation/alteration — demolition of existing sidewalks, pavement, structures, curbs, and driveways for the reconstruction of existing metropolitan methodist parking facility · 162 m away
- 844 Erie Ave · Methodist Healthcare System Of San Antonio, LtdMay 8, 2025Mmh parking — renovation/alteration — demolition of existing sidewalks, pavement, structures, curb, and driveways for the reconstruction of existing metropolitan methodist parking facility · 179 m away
- 1200 Brooklyn Ave · Methodist Healthcare SystemAug 27, 2025Urology san antonio — renovation/alteration — interior renovation to existing finish out · 193 m away
- 800 Erie Ave · Methodist Healthcare System Of San Antonio, LtdMay 8, 2025Mmh parking — new construction — construction of new metropolitan methodist parking facility. parking lot construction to include sidewalks, pavement, curbs, and driveways · 243 m away
- 1222 N Main Avenue · Heb Grocery Company LPOct 23, 2025Office facilities- cypress building 7th, 8th, 9th, and 10th floor — renovation/alteration — renovation of office spaces and interior finish out · 251 m away
- 1533 North Main Avenue · Accd Public Facility CorporationFeb 27, 2024House of alio gym — renovation/alteration — interior finish out of existing lease space for a new 6540 sq ft gym and 1064 sq ft cafe · 358 m away
- 222 W Cypress · Community Options INCMar 13, 2026Community options — renovation/alteration — interior finish out · 389 m away