1409 Northern Blvd
San Antonio, TX 78216 · San Antonio International Airport (sat)
San Antonio airport projects add holdrooms and baggage handling
San Antonio International Airport project registrations describe a Terminal A ground loading facility expansion and a baggage-handling addition. The ground loading facility was filed with TDLR on May 13, 2024, and the baggage-handling project was filed on January 10, 2025. The Terminal A project includes three holdrooms and five aircraft hardstands.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 10, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jan 10, 2025
- since May 13, 2024
- Largest scope
- 37,451 sf
- Estimated cost
- $35M
- state registration
Where this project stands
Finishing up · inspection nextSAT BHS - FIS Baggage Handing Addition Project
1 sq ft · $1.5M est.
- RegisteredJan 10, 2025
- Plan review
- ConstructionApr '25 – Oct '25
- Inspectednow
- Closed
Scheduled to finish Oct 1, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
3 projectsAddition of a new flat plate baggage handling system (bhs) claim device in a “u” shape configuration. includes new wall o.h. door openings for the bhs and oversized baggage, a new exterior canopy, signage, and power/av/security systems. — san antonio international airport (sat)
TDLR project registrationAdditions to Existing BuildingReview Complete1 sq ft$1.5M est.- Project #
- TABS2025009254
- Tenant / owner
- Sat Bhs - Fis Baggage Handing Addition Project
- Design firm
- Pro
- Contact
- Pro
Project is an expansion of the existing terminal a consisting of a pre-engineered metal building. with 3 new holdrooms & 5 hardstands for aircraft. scope includes the building and interior systems, selective demolition, new paving & site utilities. — san antonio international airport (sat)
TDLR project registrationAdditions to Existing BuildingInspection Complete37,451 sq ft$35M est.- Project #
- TABS2024018424
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Project to open a new service gate for sat, before demolishing existing one. scope includes selective demolition, new paving, a manufactured guard booth, site utilities, security fencing, entry and exit gates, bollards, striping, and turf. — san antonio international airport (sat)
TDLR project registrationNew ConstructionInspection Complete160 sq ft$1.8M est.- Project #
- TABS2024005977
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1409 Northern Blvd
What is being built at 1409 Northern Blvd?
TDLR registrations describe an expansion of Terminal A’s ground loading facility and an addition to the airport’s baggage-handling system. The filings are dated May 13, 2024, and January 10, 2025.
What is included in the Terminal A Ground Loading Facility project?
The project calls for a pre-engineered metal building with three new holdrooms and five aircraft hardstands, plus paving and site utilities. It was filed May 13, 2024, under TDLR project number TABS2024018424.
Is San Antonio International Airport adding a baggage-handling system?
A TDLR registration describes an addition to the airport’s baggage-handling system, including a new baggage claim device, an exterior canopy, and related systems. The filing date is January 10, 2025, and the project number is TABS2025009254.
When were the airport projects filed?
The Terminal A Ground Loading Facility project was filed May 13, 2024. The baggage-handling addition was filed January 10, 2025.
How much is the Terminal A Ground Loading Facility project estimated to cost?
The TDLR registration lists an estimated cost of $35.2 million for the Terminal A Ground Loading Facility project. This is the applicant’s estimate for that project.
What airport construction is planned near the San Antonio Airport Authority offices?
Airport project registrations describe a Terminal A ground loading facility expansion and a baggage-handling addition at 1409 Northern Blvd. The San Antonio Airport Authority offices listed in the records are about 193 meters away.
Also being built nearby
All of 78216- 9800 Airport Blvd. Terminal B - Ts298 · City Of San Antonio - Aviation Property And Development Manager - ConcessionsOct 30, 2025Istore express — renovation/alteration — demolition and finish out for new retail store in existing airport tenant space · 193 m away
- 9800 Airport Blvd Ta-122 · Properties & Concessions Management OfficeOct 20, 2025Panda express — renovation/alteration — new tenant space for quick serve restaurant. demolition of existing tenant space, floor and ceiling, new hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. all new interior finishes · 193 m away
- 9800 Airport Blvd · City Of San AntonioDec 29, 2025Sat terminal c — new construction — new terminal for the san antonio international airport, approximately 912,000 sq ft for all building levels · 193 m away
- 9800 Airport Blvd Glf-2 · Properties & Concessions Management OfficeOct 2, 2025Chef johnny's mercado — renovation/alteration — new tenant space for new restaurant. new hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. all interior finishes, including: floor, ceiling treatment and furniture are new · 193 m away
- 9800 Airport Blvd Ta-124 · Properties & Concessions Management OfficeMay 30, 2025Sat ta-124 tre pizzeria — renovation/alteration — existing quick service space remodel for new restaurant brand. existing hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. new back of house ceiling grid and tiles other back of house finishes are existing to · 193 m away
- 9800 Airport Blvd Ta-129 · Properties & Concessions Management OfficeJul 11, 2025Sat ta-129 freight fried chicken — renovation/alteration — existing quick service space remodel for new restaurant brand. existing hvac equipment, ductwork, electrical panels. all back of house finishes are existing to remain aside from maintenance replacements. all public facing finishes are new · 193 m away
- 9800 Airport Blvd. Tb-Fc1 · Properties & Concessions Management San Antonio AirportJan 13, 2026Popeyes — renovation/alteration — existing tenant restaurant space for new restaurant. existing hvac equipment, ductwork, plumbing and electrical panels. all finishes are new · 193 m away
- 9800 Airport Blvd. Ts-205/206 · San Antonio Airport AuthorityJun 25, 2025Military city usa — renovation/alteration — new tenant finish-out in existing airport space · 193 m away
- 9800 Airport Blvd Tb-Fc3 · Properties & Concessions Management OfficeMar 26, 2026The tasting room — renovation/alteration — existing tenant space for new restaurant with full bar. existing hvac equipment, ductwork, plumbing fixtures, and electrical panels. all finishes are new unless stated otherwise · 193 m away
- 9800 Airport Blvd. Tb-Fc2 · Properties & Concessions Management San Antonio AirportJan 13, 20262m bbq — renovation/alteration — existing restaurant space for new restaurant space. minor alterations to hvac equipment, ductwork, plumbing fixtures and electrical panels. all finishes are new · 193 m away
- 9800 Airport Blvd. Ta-182 · San Antonio Airport AuthorityJul 9, 2025Sat prickly pear ta-182 — renovation/alteration — new tenant finish-out in existing airport space · 193 m away
- 9800 Airport Blvd Tb-Ts204 · Properties & Concessions Management OfficeJul 31, 2025Southerleigh — renovation/alteration — renovation of an existing restaurant tenant space to accommodate a new restaurant. work includes: modifications to existing hvac, plumbing, electrical; install kitchen equipment, and finish changes · 193 m away
More demolitions in 78216.