4633 Perrin Creek
San Antonio, TX 78217
Caterpillar project adds a 30-by-10-foot concrete pad
A Caterpillar project at 4633 Perrin Creek calls for a new 30-by-10-foot concrete pad. The TDLR project registration, filed January 9, 2026, describes preparing the subgrade, installing rebar reinforcement and pouring the slab. The applicant's estimated project cost is $168,352; the record lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2026
- since Jan 9, 2026
- Largest scope
- 300 sf
- Estimated cost
- $168K
- state registration
Where this project stands
CompletedCAT SA Floor 2
300 sq ft · $168K est.
- RegisteredJan 9, 2026
- Plan review
- ConstructionJan '26 – Jan '26
- Inspected
- Closed
Ran as a 1-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectPrepare subgrade, provide and install new rebar reinforcement for new concrete slab. provide and pour new concrete for new slab.30'x10' new concrete pad. — caterpillar
TDLR project registrationRenovation/AlterationProject Closed300 sq ft$168K est.- Project #
- TABS2026009685
- Tenant / owner
- Cat Sa Floor 2
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4633 Perrin Creek
What is being built at 4633 Perrin Creek?
The TDLR registration describes a new 30-by-10-foot concrete pad for the Caterpillar project, including subgrade preparation, rebar reinforcement and a poured concrete slab.
When was the project at 4633 Perrin Creek permitted?
The TDLR project registration was filed January 9, 2026. The record lists the project as closed.
What is the project number for 4633 Perrin Creek?
The TDLR registration number is TABS2026009685. It was filed January 9, 2026.
How large is the concrete pad planned at 4633 Perrin Creek?
The registration describes a 30-by-10-foot pad, or 300 square feet.
How much is the 4633 Perrin Creek project estimated to cost?
The applicant's estimated cost for the project is $168,352, according to the TDLR registration.
Also being built nearby
All of 78217- 4633 Perrin Creek 4633 Perrin CreekSep 22, 2025Cat sa equipment pads — renovation/alteration — remove approx. 372 square of concrete excavate approx. 2 feet. place back fill material and pour new high strength concrete
- 9711 Cobb St · Collateral Recovery Team, LLCApr 11, 2025Cobb st — new construction — manufactured office building and deck · 389 m away
- 4848 Perrin Creek · Prologis Texas III LPOct 30, 2024Perrin creek 6 suite 640 — renovation/alteration — build out for a spec suite in an existing warehouse, partition, lighting, plumbing, mechanical, and life safety · 429 m away
- 9500 Moraga Street · City Of San Antonio Parks & Recreation Dept.Mar 28, 2025Beitel creek greenway - perrin homestead to thousand oaks — new construction — construction of a 1.92 mile long 10 foot wide ada accessible concrete hike and bike trail with pedestrian bridge and trailheads · 516 m away