11431 Vance Jackson
San Antonio, TX 78230 · Northside Independent School District
Sidewalk and playground fence work at Howsman Elementary
A project registered on Feb. 16, 2026, calls for new concrete sidewalk access to the public right-of-way and replacement of lower-level playground fencing at Howsman Elementary School. The TDLR registration lists an estimated project cost of $625,000 and shows the status as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 16, 2026
- since Feb 16, 2026
- Largest scope
- 35,754 sf
- Estimated cost
- $625K
- state registration
Where this project stands
Inspected · closing outPaving Upgrades at Howsman ES
35,754 sq ft · $625K est.
- RegisteredFeb 16, 2026
- Plan review
- ConstructionMay '26 – Jul '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectProvide new concrete sidewalk access to public right-of-way as well as the removal and replacement of the lower-level playground fencing as indicated on the drawings and specifications to include all general construction, site work, and other work. — howsman elementary school
TDLR project registrationRenovation/AlterationInspection Complete35,754 sq ft$625K est.- Project #
- TABS2026012735
- Tenant / owner
- Paving Upgrades At Howsman Es
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 11431 Vance Jackson
What is being built at 11431 Vance Jackson?
A TDLR project registration describes new concrete sidewalk access to the public right-of-way and replacement of lower-level playground fencing at Howsman Elementary School. The project was registered Feb. 16, 2026.
What's going in near Howsman Elementary School?
The registered work at Howsman Elementary includes a new concrete sidewalk connection and replacement of lower-level playground fencing. The school is listed nearby at 11349 Clifton Forge St.
Is a new school building being built at 11431 Vance Jackson?
The registration describes renovation work, including sidewalk access and playground fence replacement. It does not describe construction of a new school building.
What upgrades are planned at Howsman Elementary?
The scope calls for new concrete sidewalk access to the public right-of-way and removal and replacement of lower-level playground fencing. The TDLR project number is TABS2026012735.
How much will the Howsman Elementary project cost?
The TDLR registration lists an estimated project cost of $625,000. This is the applicant's estimate for the project.
Has work at Howsman Elementary been completed?
The TDLR registration lists the project status as inspection complete. It was registered on Feb. 16, 2026.
Also being built nearby
All of 78230- 11349 Clifton Forge St · Northside ISDApr 1, 2026Howsman elementary school — new construction — ground level play area · 144 m away
- 11441 Vance Jackson Rd · City Of San AntonioSep 4, 2024Cosa library hvac upgrades — renovation/alteration — replacement of (5) split systems, (1) exhaust fan, and addition of (1) ductless mini-split and relief hoods. ~13,900 sq ft · 153 m away
- 11643 Vance Jackson · 11643 Vance JacksonNov 19, 202411643 vance jackson — new construction — building two, three story buildings to be multi-family residences. each building will contain 6 units, each unit being 390 square feet · 362 m away