250 Heimer Road
San Antonio, TX 78232 · City Of San Antonio Public Works Department
Street and utility work planned on Perennial Drive
A project record filed April 30, 2026, describes street and utility work on Perennial Drive from Heimer Road to Dutch Myrtle. The scope includes a new storm sewer, water main and gas line, plus curbs, sidewalks, driveways and a full mill and overlay of the road. The applicant's estimated project cost is $3,286,356.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 30, 2026
- since Apr 30, 2026
- Largest scope
- 82,000 sf
- Estimated cost
- $3.3M
- state registration
Where this project stands
Under constructionPerennial Area Streets & Drainage (Heimer Road to Dutch Myrtle) COSA Project Nos. 23-03911/23-03941
82,000 sq ft · $3.3M est.
- RegisteredApr 30, 2026
- Plan review
- ConstructionJun '26 – Jun '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInstall new storm sewer main, inlets and laterals on perennial drive from heimer to dutch myrtle, concrete curb, sidewalk, driveway, new saws water main, cps gas line, and full mill & overlay on perennial from heimer to dutch myrtle — n/a
TDLR project registrationNew ConstructionReview Complete82,000 sq ft$3.3M est.- Project #
- TABS2026019011
- Tenant / owner
- Perennial Area Streets & Drainage (heimer Road To Dutch Myrtle) Cosa Project Nos. 23-03911/23-03941
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 250 Heimer Road
What is being built at 250 Heimer Road in San Antonio?
A project registration describes street and utility improvements on Perennial Drive, from Heimer Road to Dutch Myrtle. The listed work includes storm sewer, water and gas lines, curbs, sidewalks, driveways and road resurfacing.
When was the Perennial Drive project filed?
The Texas Department of Licensing and Regulation project registration, TABS2026019011, was filed April 30, 2026. Its status is listed as Review Complete.
Is a new building planned at 250 Heimer Road?
The project record describes infrastructure and roadway work, not a new building. It covers Perennial Drive from Heimer Road to Dutch Myrtle.
What street work is planned on Perennial Drive?
The listed scope includes concrete curbs, sidewalks and driveways, along with a full mill and overlay of Perennial Drive between Heimer Road and Dutch Myrtle.
What utilities are included in the Perennial Drive project?
The project description lists a new storm sewer main, inlets and laterals, a new SAWS water main and a CPS gas line.
What's planned near Stellar Express-San Pedro?
A project registration describes storm sewer, utility, sidewalk and road work on Perennial Drive from Heimer Road to Dutch Myrtle. Stellar Express-San Pedro is listed about 431 meters from the project address.
How much is the Perennial Drive project expected to cost?
The applicant's estimated cost in the TDLR registration is $3,286,356. This is an estimate for the project, not a confirmed final cost.
Also being built nearby
All of 78232- 1355 Central Parkway South · 4040 Broadway LtdJan 30, 2024Bridgehead it expansion — renovation/alteration — this project is an interior finish out for bridgehead it and consists of minor demolition and construction · 289 m away
- 1355 Central Parkway · 4040 Broadway LtdJul 1, 2024Black rifle — renovation/alteration — interior finish-out for office · 289 m away
- 13627 San Pedro Avenue · Bravos Oil Change LLCApr 10, 2026Stellar express-san pedro — new construction — new standalone mechanic shop building with office and bays · 431 m away
- 13429 San Pedro Ave · Hixon Properties Inc.Nov 10, 2026Jersey mikes - san pedro — renovation/alteration — interior tenant fitout of an existing building, scope to include non-structural architectural, mechanical, electrical and plumbing work. (1490 sq ft) · 533 m away