6220 Culebra Road
San Antonio, TX 78238 · #25034 - B312 Fire Tech Bldg., Building 189 - Lab A251 Renovation + 8 more
New testing building and clean room lab work at 6220 Culebra
A new 2,500-square-foot pre-engineered metal building for destructive testing was registered at this multi-tenant commercial site on December 8, 2025. A separate registration dated September 22, 2025, describes converting an existing office room into a 478-square-foot clean room lab.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 8, 2025
- Projects
- 10
- 10 filings
- Latest filing
- Dec 8, 2025
- since Mar 6, 2024
- Largest scope
- 36,606 sf
- Estimated cost
- $27M
- state registration
Where this project stands
Under construction#25034 - B312 Fire Tech Bldg.
2,500 sq ft · $1.5M est.
- RegisteredDec 8, 2025
- Plan review
- ConstructionFeb '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
10 projectsNew pre-engineered metal building used for destructive testing. — southwest research institute
TDLR project registrationNew ConstructionReview Complete2,500 sq ft$1.5M est.- Project #
- TABS2026007416
- Tenant / owner
- #25034 - B312 Fire Tech Bldg.
- Design firm
- Pro
- Contact
- Pro
Conversion of an existing office room into a clean room lab. — southwest research institute
TDLR project registrationRenovation/AlterationReview Complete478 sq ft$150K est.- Project #
- TABS2026001442
- Tenant / owner
- Building 189 - Lab A251 Renovation
- Design firm
- Pro
- Contact
- Pro
Renovation of an existing metal building storage addition to building 063 into finished space. includes new interior partitions, floor finish, acoustic lay-in ceiling, new lighting, and hvac upgrades. — tribology building
TDLR project registrationRenovation/AlterationInspection Complete1,184 sq ft$233K est.- Project #
- TABS2025002233
- Tenant / owner
- Building 63 - Tribology Annex Renovation
- Design firm
- Pro
- Contact
- Pro
New industrial testing building - open on all four sides, large covered canopy for equipment. — 307
TDLR project registrationNew ConstructionProject Closed14,299 sq ft$4.5M est.- Project #
- TABS2025000010
- Tenant / owner
- Swri Hydrocarbon Testing Facility Phase II
- Design firm
- Pro
- Contact
- Pro
This consist cafeteria phase ii remodel of existing cafeteria lobby/serving area remodel. remodel will include equipment replacement, paint, flooring and ceiling will be replaced in areas as indicated on drawings. — swri building. 161
TDLR project registrationRenovation/AlterationProject Closed3,728 sq ft$969K est.- Project #
- TABS2024021917
- Tenant / owner
- Swri Bldg. 161 Cafeteria Remodel Phase II
- Design firm
- Pro
- Contact
- Pro
New concrete research building. — building 305
TDLR project registrationNew ConstructionProject Closed36,606 sq ft$27M est.- Project #
- TABS2024016041
- Tenant / owner
- Swri B305 Camp
- Design firm
- Pro
- Contact
- Pro
Remodeling & enclosing existing space of building which is 1,596 sq ft, the use will not change and stay as "fii". part of the existing building has a covered area which will be enclosed and encompass 1,301 sq ft — swri building. 283
TDLR project registrationRenovation/AlterationProject Closed2,897 sq ft$575K est.- Project #
- TABS2024013213
- Tenant / owner
- Swri Bldg. 283 Office Remodel
- Design firm
- Pro
- Contact
- Pro
Remodeling existing space of building which is 3,449 sq ft, the use will not change and stay as buisness. in two of the existing offices we will add windows along corriddor and combine several small offices into two large office space. — building. 68
TDLR project registrationRenovation/AlterationProject Closed3,449 sq ft$666K est.- Project #
- TABS2024006516
- Tenant / owner
- Swri Bldg. 68 Office Remodel
- Design firm
- Pro
- Contact
- Pro
New professional research laboratory building. — building 298
TDLR project registrationNew ConstructionInspection Complete16,000 sq ft$10M est.- Project #
- TABS2023026143
- Tenant / owner
- Swri Building 298
- Design firm
- Pro
- Contact
- Pro
New professional research laboratory building. — building 296
TDLR project registrationNew ConstructionInspection Complete13,000 sq ft$8.0M est.- Project #
- TABS2023017064
- Tenant / owner
- Swri Building 296
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6220 Culebra Road
What is being built at 6220 Culebra Road?
A TDLR registration describes a new pre-engineered metal building for destructive testing at the multi-tenant site. A separate project covers converting an existing office room into a clean room lab.
When was the new testing building registered?
The registration for the 2,500-square-foot building was filed December 8, 2025. Its project number is TABS2026007416.
How large is the new building at 6220 Culebra Road?
The TDLR registration lists the new pre-engineered metal building at 2,500 square feet.
Is a clean room lab also planned for the site?
A September 22, 2025, TDLR registration describes converting an existing office room into a 478-square-foot clean room lab. The project number is TABS2026001442.
Are both projects new construction?
No. The 2,500-square-foot testing building is listed as new construction, while the clean room lab project is listed as a renovation or alteration.
Also being built nearby
All of 78238- 6220 Culebra Rd · Southwest Research InstituteOct 10, 2024Southwest research institute collaboration areas — new construction — in coordination with landscape forms, we are creating outdoor collaboration spaces with (3) upfit structures. these will have new paving, and concrete path connections from existing walks nearby
- 6220 Culebra Road San Antonio, TX 78238 · Swri Bldg 307bMay 27, 2024Swri hydrocarbon testing facility — new construction — 1,600sf phase i: infrastructure to extend to new buildings 307a & 307b for steam generator and electrical room with restroom to be non occupied structures
- 6220 Culebra Rd · Southwest Research InstituteApr 16, 2024Swri b227 remodel — renovation/alteration — remodel of existing 5000 sq ft warehouse into a metal fabrication machine shop
- 6220 Culebra Road · Bldg. 152Oct 13, 2024Swri building. 152 office & restroom remodel — renovation/alteration — interior remodel of conference room and bathrooms
- 6200 Culebra · Division 16 New Office Building B310Apr 8, 2025Swri division 16 new office building b310 — new construction — new 3 level office building to include site work, structure, mechanical, electrical, and plumbing scopes · 57 m away
- 6200 Culebra · Building 306Jul 22, 2024New pharma lab — new construction — new pharmaceutical laboratory. scope of work includes site work, building construction, with concrete, structural steel, concrete tilt wall panels, mechanical, electrical, and plumbing systems · 57 m away