groundranger
Historic · latest filing Jan 2025Commercial

13011 Kyle Seale Parkway

San Antonio, TX 78249 · Northside Independent School District

Brandeis High School locker and flooring renovation

A renovation at Brandeis High School includes replacing existing lockers, installing epoxy flooring over existing concrete, and painting the boys’ and girls’ locker rooms. The project was registered with the Texas Department of Licensing and Regulation on January 13, 2025, and is listed as closed. The applicant estimated the project cost at $925,000.

Summarized from Texas Department of Licensing and Regulation records · updated Jan 13, 2025

Projects
1
1 filings
Latest filing
Jan 13, 2025
since Jan 13, 2025
Largest scope
14,025 sf
Estimated cost
$925K
state registration

Where this project stands

Completed

Brandeis HS PE Locker & Flooring Replacement

14,025 sq ft · $925K est.

  1. RegisteredJan 13, 2025
  2. Plan review
  3. ConstructionMay '25 – Aug '25
  4. Inspected
  5. Closed

Ran as a 4-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Replacing all existing lockers in kind, installing new epoxy flooring over existing concrete and painting walls at both boy's and girls locker rm. — nisd louis d. brandies high school

    TDLR project registrationRenovation/AlterationProject Closed14,025 sq ft$925K est.
    Tenant / owner
    Brandeis Hs Pe Locker & Flooring Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 13011 Kyle Seale Parkway

What is being built at 13011 Kyle Seale Parkway?

The project is a renovation at Brandeis High School, not a new building. It covers locker replacement, epoxy flooring, and painting in both locker rooms.

What work is planned at Brandeis High School?

The project registration describes replacing existing lockers in kind, installing epoxy flooring over existing concrete, and painting the boys’ and girls’ locker rooms.

When was the Brandeis High School renovation registered?

The Texas Department of Licensing and Regulation registration was filed on January 13, 2025. The project number is TABS2025009392.

How much will the Brandeis High School locker renovation cost?

The applicant estimated the project cost at $925,000. This is an estimate for the project, not a confirmed final cost.

How large is the Brandeis High School renovation?

The project registration lists 14,025 square feet.

Is the Brandeis High School renovation still underway?

The TDLR record lists the project status as closed.

Get alerts for 13011 Kyle Seale Parkway