5734 Farinon Drive

San Antonio, TX 78249 · Northside Independent School District

NISD Kelly Smith Technology Center mechanical upgrades

Mechanical upgrades at the Northside ISD Kelly Smith Technology Center at 5734 Farinon Drive will replace the building’s computer room air-conditioning units and associated condensing units. The TDLR project registration was filed March 26, 2024, and lists an estimated project cost of $1.2 million for the approximately 12,500-square-foot building.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 26, 2024

Projects
1
1 filings
Latest filing
Mar 26, 2024
since Mar 26, 2024
Largest scope
12,500 sf
Estimated cost
$1.2M
state registration

Where this project stands

Completed

NISD Kelly Smith Technology Center Mechanical Upgrades

12,500 sq ft · $1.2M est.

  1. RegisteredMar 26, 2024
  2. Plan review
  3. ConstructionAug '24 – Sep '24
  4. Inspected
  5. Closed

Ran as a 1-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. The building is approximately 12,500 square feet and the scope of work will consist of replacing in place the computer room air conditioning (crac) units and there associated condensing units. — kelly smith technology center

    TDLR project registrationRenovation/AlterationProject Closed12,500 sq ft$1.2M est.
    Tenant / owner
    Nisd Kelly Smith Technology Center Mechanical Upgrades
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5734 Farinon Drive

What is being built at 5734 Farinon Drive?

The registered work is a renovation to replace the computer room air-conditioning units and associated condensing units at the Kelly Smith Technology Center. TDLR lists the project as closed.

What is the Kelly Smith Technology Center project in San Antonio?

It is a Northside Independent School District mechanical-upgrade project at the approximately 12,500-square-foot center. The TDLR registration, filed March 26, 2024, is TABS2024014697.

How much will the Kelly Smith Technology Center upgrades cost?

The TDLR registration lists an estimated project cost of $1.2 million. This is the applicant’s estimate for the project.

What work is planned at the NISD technology center on Farinon Drive?

The scope describes replacing the computer room air-conditioning units in place, along with their associated condensing units. The registration does not describe a new building.

What is being built near Walmart on De Zavala Road?

At 5734 Farinon Drive, about 388 meters from the Walmart at 5555 De Zavala Road, the registered project is mechanical upgrades to the Kelly Smith Technology Center. The work is not described as a Walmart project.

What is being built near Sam’s Club on De Zavala Road?

The project at 5734 Farinon Drive, about 390 meters from Sam’s Club at 5565 De Zavala Road, is a replacement of the technology center’s computer room air-conditioning and condensing units.

Also being built nearby

All of 78249
Get alerts for 5734 Farinon Drive