6571 Spring Time St
San Antonio, TX 78249 · City Of San Antonio
Spring Time Park improvements include a pavilion and walking trail
Improvements to Spring Time Park on 2.75 acres include a pavilion with picnic tables, a concrete loop walking trail, lighting, a drinking fountain with bottle filler, shade at the existing skate park, and an enclosed portable restroom. The project was registered with TDLR on April 17, 2024, and is listed as inspection complete. The applicant estimated the project cost at $498,000.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 17, 2024
- since Apr 17, 2024
- Largest scope
- 119,790 sf
- Estimated cost
- $498K
- state registration
Where this project stands
Inspected · closing outSpring Time Park #23-04022
119,790 sq ft · $498K est.
- RegisteredApr 17, 2024
- Plan review
- ConstructionJul '24 – Sep '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 project2.75 acres - park improvements include a new pavilion with picnic tables, a new concrete loop walking trail, new lighting, a new drinking fountain with bottle filler, new shade at the existing skate park, and an enclosed portable restroom. — spring time park
TDLR project registrationRenovation/AlterationInspection Complete119,790 sq ft$498K est.- Project #
- TABS2024016405
- Tenant / owner
- Spring Time Park #23-04022
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6571 Spring Time St
What is being built at 6571 Spring Time St in San Antonio?
Spring Time Park improvements include a pavilion with picnic tables, a concrete loop walking trail, new lighting, a drinking fountain with bottle filler, shade at the existing skate park, and an enclosed portable restroom. The TDLR registration is project TABS2024016405.
When were the Spring Time Park improvements permitted?
The project was registered with TDLR on April 17, 2024. It is listed as an alteration and renovation, with inspection complete.
How much will the Spring Time Park project cost?
The applicant estimated the project cost at $498,000. This is an estimate for the project, not a final reported cost.
What's being improved near Northside ISD on Spring Time Drive?
Spring Time Park, at 6571 Spring Time St, is slated for improvements including a pavilion, walking trail, lighting, and shade at the existing skate park. The Northside ISD address in the records is 6614 Spring Time Dr, about 138 meters away.
Is a new restroom being built at Spring Time Park?
A later filing dated July 22, 2025, describes construction of an accessible, single-user unisex restroom along the back wall of the existing park bath house. The filing says it will be accessed from a new walking trail.
Who is listed for the Spring Time Park project?
The fact sheet lists the City of San Antonio at 6571 Spring Time St. The TDLR project is named “Spring Time Park #23-04022.”
Also being built nearby
All of 78249- 6571 Spring Time Drive · City Of San AntonioJul 22, 2025Spring time park unisex restroom — new construction — an accessible, single-user, unisex restroom to be constructed along the back wall to the existing park bath house, and accessed via a new walking train (constructed by others), not through the existing bath house or fenced pool area
- 6614 Spring Time Dr · Northside ISDMar 31, 2026Boone elementary school — new construction — ground level play area · 138 m away