groundranger
Recent · latest filing Jul 2026Commercial

3535 N Ellison Dr

San Antonio, TX 78251 · Nvc Stem Stair Well Modification, Alamo Colleges Northwest Vista College Hvac Replacement + 2 more

Northwest Vista College building gets stair and HVAC renovations

TDLR registrations show stair-tread and toe-kick replacement in the Northwest Vista College STEM building, filed July 29, 2026. A separate HVAC replacement and renovation of mechanical, electrical, and IDF spaces was filed April 29, 2025; the multi-tenant site has records for both projects.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 29, 2026

Projects
4
4 filings
Latest filing
Jul 29, 2026
since Feb 6, 2024
Largest scope
57,500 sf
Estimated cost
$27M
state registration

Where this project stands

Under construction

NVC STEM Stair Well Modification

2,000 sq ft · $239K est.

  1. RegisteredJul 29, 2026
  2. Plan review
  3. ConstructionNov '26 – Dec '26
  4. Inspected
  5. Closed
35% through of a 2-month buildNov 2, 2026 → Dec 21, 2026

4 contacts on this project · 3 phone numbers

Permit & project history

4 projects
  1. Replace stair treads and toe kicks on existing staircase framework on each end of the building. (no work/changes to structural framework of stairways.) — northwest vista college - stem building

    TDLR project registrationRenovation/AlterationReview Complete2,000 sq ft$239K est.
    Tenant / owner
    Nvc Stem Stair Well Modification
    Design firm
    Pro
    Contact
    Pro
  2. 9000 sq ft of idf, mechanical, and electrical spaces renovated to replace minisplit systems. includes hvac, electrical, minor roof/envelope, and finishes. — pca, rlc, loh

    TDLR project registrationRenovation/AlterationProject Closed9,000 sq ft$675K est.
    Tenant / owner
    Alamo Colleges Northwest Vista College Hvac Replacement
    Design firm
    Pro
    Contact
    Pro
  3. 49,500 sq ft removation of an existing building to become a dining and education facility — cypress campus center

    TDLR project registrationRenovation/AlterationInspection Complete49,500 sq ft$27M est.
    Tenant / owner
    Northwest Vista College Cypress Campus Center Renovation
    Design firm
    Pro
    Contact
    Pro
  4. Upgrade maintenance equipment to three buildings- texas persimmons physical plant, pecan hall and mexican persimmons, to extend the life of aging facilities and increase energy savings. — mexican persimmons physical plant, pecan hall, texas persimmons physical plant

    TDLR project registrationRenovation/AlterationProject Closed57,500 sq ft$3.9M est.
    Tenant / owner
    Northwest Vista College Maintenance Improvements
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 3535 N Ellison Dr

What is being built at 3535 N. Ellison Dr?

TDLR records describe renovations, not a new building: stair treads and toe kicks are being replaced in the Northwest Vista College STEM building. A separate project covers HVAC replacement and related work in mechanical, electrical, and IDF spaces.

What work was filed for 3535 N. Ellison Dr in 2026?

The July 29, 2026 TDLR registration, TABS2026026448, describes replacing stair treads and toe kicks on existing staircases. It says the stairway structural framework will not be changed.

Is there an HVAC project at 3535 N. Ellison Dr?

Yes. TDLR registration TABS2025017801, filed April 29, 2025, describes replacing mini-split systems and renovating 9,000 square feet of IDF, mechanical, and electrical spaces, with related electrical, roof and envelope, and finish work.

How much will the Northwest Vista College HVAC project cost?

The applicant's TDLR estimate for the HVAC project is $675,000. This is an estimate for that project, not a reported total cost for all work at the address.

What's being renovated near the Northwest Vista Cyber Cafe Refresh?

At 3535 N. Ellison Dr, TDLR records describe stair-tread and toe-kick replacement in the Northwest Vista College STEM building. The Cyber Cafe Refresh is listed separately at 3606 N. Ellison Dr, about 133 meters away.

When were the projects at 3535 N. Ellison Dr filed?

The HVAC replacement registration, TABS2025017801, was filed April 29, 2025. The stairwell modification, TABS2026026448, was filed July 29, 2026.

Also being built nearby

All of 78251

More restaurants in 78251, schools & daycares in 78251.

Email me when it passes inspection