5106 West Loop
San Antonio, TX 78251 · Methodist Healthcare System Of San Antonio Ltd. Llp
Methodist Hospital Westover Hills plans two ICU units
A shell build-out for two intensive care units was registered at Methodist Hospital Westover Hills on July 3, 2025. The TDLR registration describes renovation work on the hospital’s third level and lists an estimated project cost of $700,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2025
- since Jul 3, 2025
- Largest scope
- 688 sf
- Estimated cost
- $700K
- state registration
Where this project stands
CompletedMethodist Hospital Westover Hills - ICU shell build out
688 sq ft · $700K est.
- RegisteredJul 3, 2025
- Plan review
- ConstructionSep '25 – Dec '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectShell build out of (2) intensive units care at methodist westover hills hospital third level. — methodist hospital westover hills
TDLR project registrationRenovation/AlterationProject Closed688 sq ft$700K est.- Project #
- TABS2025022715
- Tenant / owner
- Methodist Hospital Westover Hills - Icu Shell Build Out
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5106 West Loop
What is being built at 5106 West Loop?
A shell build-out for two intensive care units at Methodist Hospital Westover Hills was registered on July 3, 2025. The TDLR project registration is TABS2025022715.
Is Methodist Hospital Westover Hills adding ICU space?
The TDLR registration describes a shell build-out for two intensive care units on the hospital’s third level. It lists the project as a renovation or alteration.
How much will the Methodist Hospital Westover Hills ICU project cost?
The TDLR registration lists an estimated project cost of $700,000. This is the project estimate reported in the registration.
What is being built near H-E-B at 6000 West Ave?
A shell build-out for two intensive care units was registered at Methodist Hospital Westover Hills, 5106 West Loop. The project was registered July 3, 2025.
Is there hospital construction near Antonian College Preparatory High School?
The records show a shell build-out for two ICU units at Methodist Hospital Westover Hills, about 597 meters from Antonian College Preparatory High School. The project registration describes work on the hospital’s third level.
Also being built nearby
All of 78251- 6000 West Ave · Heb GroceryMay 8, 2024Heb san antonio 24 remodel — renovation/alteration — remodel of existing heb store · 251 m away
- 2300 Ingleside Dr · City Of San AntonioJun 6, 2026Windsor park — renovation/alteration — basketball court construction, grading, flatwork, and bench seating. 15,850 sq ft · 365 m away
- 6100 West Ave · Finck CigarsMar 4, 2026Finck cigars - additions & renovations — renovation/alteration — scope of work consists of renovations to an existing approx. 3,000 sq ft cigar lounge and retail area which include the expansion of the humidor room and smoking lounge, relocation of two bathrooms, maintenance closet, and break room · 440 m away
- 6245 West Ave · Antonian College Preparatory High SchoolAug 14, 2025Tennis court parking renovation — renovation/alteration — pavement maintenance and replacement (28,800 sq ft) · 597 m away