groundranger
Historic · latest filing Jan 2025Commercial

600 N Ellison Drive

San Antonio, TX 78251 · Northside Independent School District

Locker and flooring renovation at John Paul Stevens High School

A renovation at John Paul Stevens High School will replace existing PE lockers, install epoxy flooring over existing concrete and repaint both locker rooms. The TDLR project registration was filed January 13, 2025, and lists 12,880 square feet of work.

Summarized from Texas Department of Licensing and Regulation records · updated Jan 13, 2025

Projects
1
1 filings
Latest filing
Jan 13, 2025
since Jan 13, 2025
Largest scope
12,880 sf
Estimated cost
$925K
state registration

Where this project stands

Completed

Stevens HS PE Locker & Flooring Replacement

12,880 sq ft · $925K est.

  1. RegisteredJan 13, 2025
  2. Plan review
  3. ConstructionMay '25 – Aug '25
  4. Inspected
  5. Closed

Ran as a 4-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Replacing all existing lockers in kind, installing new epoxy flooring over existing concrete and painting walls at both boy's and girls locker rm. — nisd john paul stevens high school

    TDLR project registrationRenovation/AlterationProject Closed12,880 sq ft$925K est.
    Tenant / owner
    Stevens Hs Pe Locker & Flooring Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 600 N Ellison Drive

What is being built at 600 N Ellison Drive?

The project is a renovation at John Paul Stevens High School, not a new building. It includes locker replacement, new epoxy flooring and painting in both PE locker rooms.

When was the John Paul Stevens High School renovation filed?

The TDLR project registration was filed January 13, 2025. Its project number is TABS2025009410.

What work is planned for the school locker rooms?

The project description says existing lockers will be replaced, epoxy flooring will be installed over the existing concrete, and the boys’ and girls’ locker room walls will be painted.

How much will the Stevens High School renovation cost?

The TDLR registration lists an estimated project cost of $925,000. This is the applicant’s estimate.

How large is the locker and flooring project at Stevens High School?

The TDLR record lists the project at 12,880 square feet.

Is the work near the new Culebra Meat Market?

The school renovation is listed at 600 N Ellison Drive. A separate adaptive reuse project for a new Culebra Meat Market is listed 218 meters away at 9838 Potranco Road.

Also being built nearby

All of 78251
Get alerts for 600 N Ellison Drive