1 Lone Star Pass

San Antonio, TX 78264 · Tmmtx Sitework 1, Tmmtx Make Space + 5 more

Parking and site work registered at 1 Lone Star Pass

TDLR registrations filed from July through October 2026 describe parking and trailer-yard work, plus site work for a future building expansion at the multi-tenant site at 1 Lone Star Pass. The records include pavement, fencing, lighting, a guard booth, detention pond modifications, and two temporary modular buildings.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 26, 2026

Projects
8
8 filings
Latest filing
Oct 26, 2026
since Nov 15, 2024
Largest scope
3,131,141 sf
Estimated cost
$200M
state registration

Where this project stands

Approved · construction starts Dec 10, 2026

Toyota South Trailer City Parking Lot 1,2,3

$900K est.

  1. RegisteredOct 26, 2026
  2. Plan review
  3. ConstructionDec '26 – Mar '27
  4. Inspected
  5. Closed

A 3-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.

4 contacts on this project · 3 phone numbers

Permit & project history

8 projects
  1. Scrape ground, base installation, asphalt and 2 temporary modular buildings — toyota motor manufacturing tx

    TDLR project registrationNew ConstructionReview Complete1 sq ft$900K est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro
  2. TMMTX Sitework 1

    Site work for future building expansion — toyota motor manufacturing texas

    TDLR project registrationNew ConstructionProject Registered3,131,141 sq ft$200M est.
    Tenant / owner
    Tmmtx Sitework 1
    Design firm
    Pro
    Contact
    Pro
  3. TMMTX Make Space

    Added pavement, fence, lighting & guard booth for west trailer yard and team member parking areas. modify existing detention pond. — toyota motor manufacturing texas

    TDLR project registrationNew ConstructionProject Registered1,502,820 sq ft$13M est.
    Tenant / owner
    Tmmtx Make Space
    Design firm
    Pro
    Contact
    Pro
  4. TMMTX Assembly Docks

    Remove 2 truck docks and replace with 1 overhead door and concrete ramp. add 4 new truck docks. — toyota motor manufacturing texas

    TDLR project registrationRenovation/AlterationProject Closed10,000 sq ft$1.5M est.
    Tenant / owner
    Tmmtx Assembly Docks
    Design firm
    Pro
    Contact
    Pro
  5. TMMTX Project Plan B

    Interior general construction for new production building approximately 494,000 sq ft 2021 building codes. sitework/foundation com-sit-pmt24-40100364. — toyota motor manufacturing texas

    TDLR project registrationNew ConstructionProject Registered494,000 sq ft$120M est.
    Tenant / owner
    Tmmtx Project Plan B
    Design firm
    Pro
    Contact
    Pro
  6. TMMTX PE Office Trailer

    7,700sf temporary office trailer with workstations, break area, and toilet room. power and water utility feeds to trailer from adjacent building — toyota motor manufacturing texas

    TDLR project registrationNew ConstructionInspection Complete7,700 sq ft$1.5M est.
    Tenant / owner
    Tmmtx Pe Office Trailer
    Design firm
    Pro
    Contact
    Pro
  7. Add new pemb shelter with interior cmu walls, metal decking, new restroom fixtures and light fixtures, new hvac system — toyota motor manufacturing texas

    TDLR project registrationAdditions to Existing BuildingProject Closed960 sq ft$64K est.
    Tenant / owner
    Toyota Final Line Shelter Expansion Restroom Addition
    Design firm
    Pro
    Contact
    Pro
  8. Concrete foundation, pemb metal finish, overhead lighting, man door opening — toyota visitor center

    TDLR project registrationNew ConstructionProject Closed1,250 sq ft$85K est.
    Tenant / owner
    Toyota Experience Center Shuttle Shelter
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1 Lone Star Pass

What is being built at 1 Lone Star Pass in San Antonio?

TDLR registrations describe trailer-yard and team-member parking improvements, site work for a future building expansion, and two temporary modular buildings. The registrations were filed between July 14 and October 26, 2026.

Is there a new parking lot planned at 1 Lone Star Pass?

A TDLR registration dated October 26, 2026, names the project “Toyota South Trailer City Parking Lot 1,2,3.” Its description includes ground scraping, base installation, asphalt, and two temporary modular buildings.

What is the TMMTX Make Space project?

The July 14, 2026, TDLR registration describes pavement, fencing, lighting, and a guard booth for west trailer yard and team-member parking areas, along with modifications to an existing detention pond.

Is a building expansion planned at 1 Lone Star Pass?

A TDLR registration filed September 21, 2026, describes site work for a future building expansion. The registration does not specify what the future building will contain.

How much will the work at 1 Lone Star Pass cost?

The TDLR record lists an applicant-estimated cost of $200 million for the site-work project. This is an estimate, not a confirmed final project cost.

What is the status of the parking project at 1 Lone Star Pass?

The October 26, 2026, registration for Toyota South Trailer City Parking Lot 1,2,3 is marked “Review Complete.” The September 21 and July 14 registrations are marked “Project Registered.”