1409 W Chapman Dr
Sanger, TX 76266 · Peak Physical Therapy - Sanger, Dorado Nail Bar
Physical therapy suite planned at 1409 W Chapman Dr
A 1,624-square-foot ground-level suite in an existing multi-tenant building is planned for outpatient physical therapy. A TDLR project registration for Peak Physical Therapy - Sanger was filed March 19, 2026; the record describes a tenant buildout.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 19, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 19, 2026
- since Jun 20, 2025
- Largest scope
- 4,500 sf
- Estimated cost
- $200K
- state registration
Where this project stands
Finishing up · inspection nextPeak Physical Therapy - Sanger
1,624 sq ft · $194K est.
- RegisteredMar 19, 2026
- Plan review
- ConstructionApr '26 – Jun '26
- Inspectednow
- Closed
Scheduled to finish Jun 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsTenant buildout of a 1624 sq ft ground level suite in an existing tenant building. intended use is for outpatient physical therapy — sanger crossing shopping center
TDLR project registrationRenovation/AlterationReview Complete1,624 sq ft$194K est.- Project #
- TABS2026015503
- Tenant / owner
- Peak Physical Therapy - Sanger
- Design firm
- Pro
- Contact
- Pro
Finish out — sanger tomb thumb
TDLR project registrationNew ConstructionReview Complete4,500 sq ft$200K est.- Project #
- TABS2025021776
- Tenant / owner
- Dorado Nail Bar
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1409 W Chapman Dr
What is being built at 1409 W Chapman Dr in Sanger?
A 1,624-square-foot ground-level suite in an existing multi-tenant building is planned for outpatient physical therapy. The TDLR registration names Peak Physical Therapy - Sanger.
When was the Peak Physical Therapy project filed?
The TDLR project registration was filed March 19, 2026. Its project number is TABS2026015503.
How large is the physical therapy buildout at 1409 W Chapman Dr?
The registered tenant buildout covers 1,624 square feet on the building's ground level.
Is a nail bar also listed at this address?
A TDLR registration dated June 20, 2025, lists a 4,500-square-foot finish-out for Dorado Nail Bar. The record describes it as a finish-out at Sanger Tomb Thumb.
What's happening near Jersey Mike's on West Chapman Drive?
The address record lists Jersey Mike's Subs at 1409 West Chapman Drive, alongside the planned Peak Physical Therapy tenant buildout. The building is described as an existing tenant building.
What's happening near Wings Over Sanger on Chapman Drive?
Wings Over Sanger is listed at 1409 W Chapman Drive, the same address as the registered Peak Physical Therapy tenant buildout. The project record does not describe the whole address as a single tenant.
Also being built nearby
All of 76266- 1409 Chapman Drive · Sanger Retail LtdOct 6, 2025At&t - sanger — renovation/alteration — interior renovation of an at&t store in an existing suite
- 1409 West Chapman Dr · Sanger RetailOct 12, 2026Jersey mikes subs — renovation/alteration — the scope of this project is the design of a proposed interior build-out within an existing shell building retail center. provide new architectural, electrical, plumbing and mechanical features
- 1409 W Chapman Drive · 1409 W Chapman Drive Suite 300 Sanger TX 76266May 21, 2026Wings over sanger — renovation/alteration — interior finish out for restaurant
- 1405 West Chapman · Sanger BankMar 20, 2025Sanger bank second floor — renovation/alteration — an alteration on the second floor · 8 m away
- 1501 West Chapman Dr · Greystar Development Central LLCJul 22, 2024Birchway sanger — new construction — construction of a 306 unit multifamily project with approximately 280k net rentable sq ft there will also be a single story clubhouse and swimming pool · 200 m away
- 1505 W Chapman Dr · Sanger Retail, Ltd.Oct 29, 2026Jacob & bella's bridge — new construction — interior tenant finish-out for a new integrated therapy services within an existing shell building, including partitions, restrooms, doors, ceilings, finishes, and required mep systems · 201 m away
- 1660 W. Chapman Dr. S. 200 · Mail Call Packing & ShippingApr 15, 2026Mailbox sanger — renovation/alteration — interior up-fit with a new toilet and existing parking · 299 m away
- 1660 W. Chapman Dr · Reed Office BuildingJan 12, 2024Reed office building — renovation/alteration — existing shell building with a portion (1,080 sq ft) to have a tenant-upfit. parking and egress doors are existing · 299 m away
- 1660 W. Chapman · Lone Oak Land And Cattle, LLCApr 28, 2025The reed building — renovation/alteration — tenant up-fit for a 1,450 _+ sq ft building containing offices & toilet. parking is existing · 299 m away
- 1645 W Chapman Dr · Tyler-Longview 7 Brew LLCAug 15, 20257 brew coffee - sanger — new construction — construction of a 541sf pre-fabricated drive-through only coffee shop · 419 m away
- 1003 S 5th St · Cd Dg Sanger, LLCApr 22, 2026Cd dg sanger, llc — renovation/alteration — interior finishes, new walk in cooler, meps and parking infront of the building 2562sqft · 468 m away
More restaurants in 76266.