5000 NW Frontage Road

Sealy, TX 77474 · Hailiang Copper Tubing Facility Building # 6 F-H Axis Renovation Project, Hailiang Copper Tubing Facility Building # 16 Packaging Room Renovation + 9 more

Sealy copper facility plans new buildings and renovations

TDLR registrations indicate new manufacturing, warehouse and support buildings, along with renovations, at a multi-tenant industrial facility in Sealy. The 11 project registrations were filed from November 14, 2025, through October 14, 2026; the latest covers renovations to Building 6. TDLR lists an applicant estimate of $35 million for the project.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 14, 2026

Projects
11
11 filings
Latest filing
Oct 14, 2026
since Nov 14, 2025
Largest scope
859,275 sf
Estimated cost
$35M
state registration

Where this project stands

In state plan review

Hailiang Copper Tubing Facility Building # 6 F-H axis Renovation Project

122,332 sq ft · $1.3M est.

  1. RegisteredOct 14, 2026
  2. Plan reviewnow
  3. ConstructionDec '26 – Jul '27
  4. Inspected
  5. Closed

Construction is scheduled to start Dec 15, 2026. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 2 phone numbers

Permit & project history

11 projects
  1. To renovate existing construction type iib fully sprinkled warehouse buildig #6 between f-h axis to f-1 and f-2 occupancies plant by adding new outdoor canopy, pad, equipment footings, new fire rating partition walls, and associate mep to faciliat — hailiang copper tubing facility building # 6 f-h axis

    TDLR project registrationRenovation/AlterationProject Registered122,332 sq ft$1.3M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 6 F-H Axis Renovation Project
    Design firm
    Pro
    Contact
    Pro
  2. To renovate a packaging room with associated mep inside the existing construction type iib partial sprinkled f-2 copper manufacturing facility building # 16, fp & to be deferred — hailiang copper tubing facility building # 16

    TDLR project registrationRenovation/AlterationProject Registered8,554 sq ft$1.0M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 16 Packaging Room Renovation
    Design firm
    Pro
    Contact
    Pro
  3. To buld a construction type iib with fully automatic sprinkler system and associated m.e.p. to faciliate a s-1 occupancy automatic storage and retrieval system warehouse building to store noncombustible metal copper pipes and copper bars. — hailiang copper tubing facility building # 29

    TDLR project registrationNew ConstructionProject Registered58,442 sq ft$3.5M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 29 New Construction
    Design firm
    Pro
    Contact
    Pro
  4. To buld a construction iib non- sprinkled building to facilitate an occupancy f-2 copper casting and manufacturing workshop, offices, and warehousing spaces at 1st, 3rd, and 4th floor. and a construction type iia with automatic sprinkler system on 2 — hailiang copper tubing facility building # 20

    TDLR project registrationNew ConstructionProject Registered859,275 sq ft$35M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 20 New Construction
    Design firm
    Pro
    Contact
    Pro
  5. To build a new construct type iib 8,896 s.f. non- sprinkled non-air conditioned f-1 occupancy building shell and mep to faciliate a future wastewater treatment station ( tceq 30 tac ch. 217) to support the hailiang copper manufacturing workshops. s — hailiang copper tubing facility building # 23

    TDLR project registrationNew ConstructionProject Registered8,896 sq ft$350K est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 23 New Construction
    Design firm
    Pro
    Contact
    Pro
  6. To build a new construct type iib non- sprinkled non-air conditioned s-2 occupancy building and asociated mep to faciliate solid slag waste material temporary storage to support the hailiang copper manufacturing workshops — hailiang copper tubing facility building # 22

    TDLR project registrationNew ConstructionProject Registered1,361 sq ft$50K est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 22 New Construction
    Design firm
    Pro
    Contact
    Pro
  7. To renovate existing construction type iib warehouse buildig to f-1 and f-2 occupancies plant by adding new outdoor canopy, pad, equipment footings, pavement, new enclosure under an existing canopy, new fire rating partition walls, new sound proof — hailiang copper tubing facility building # 6

    TDLR project registrationRenovation/AlterationReview Complete291,297 sq ft$4.0M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 6 Renovation Project
    Design firm
    Pro
    Contact
    Pro
  8. A renovation project adding an equipment pit, equipment footings, and associated mep to an existing non-sprinkled non-air conditioned construction type ii b/ f-2 usage building to faciliate a copper casting plant — hailiang copper tubing facility building # 8

    TDLR project registrationRenovation/AlterationProject Registered19,793 sq ft$180K est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 8 Renovation Project
    Design firm
    Pro
    Contact
    Pro
  9. New construction type iib building to facilitate the occupancy f-1 and f-2 copper casting and manufacturing plant, office, and warehouses with partial automatic sprinkler system. phase 1 building shell — hailiang copper tubing facility building # 18

    TDLR project registrationNew ConstructionProject Registered452,178 sq ft$30M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 18 New Construction
    Design firm
    Pro
    Contact
    Pro
  10. To renovate existing fully sprinkled construction type ii-b warehouse building to f-2 copper manufacturing facility. add new pump room , air compressor room, vibration cleaning room (f-1), accessories rooms and associate mep to facilitate equipments — hailiang copper tubing facility building # 11

    TDLR project registrationRenovation/AlterationReview Complete140,188 sq ft$3.0M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 11 Renovation Project
    Design firm
    Pro
    Contact
    Pro
  11. To add equipment foundations, pits, cranes, equipment platform, and associated equipments mech., elec., plumbing works and devices of the phase 2 production line 2 & 3 ( 173,666.7 s.f.) — hailiang copper tubing facility building # 16

    TDLR project registrationRenovation/AlterationReview Complete174,000 sq ft$4.9M est.
    Tenant / owner
    Hailiang Copper Tubing Facility Building # 16 Renovation Project Phase 2 - Production Line 2 And 3
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5000 NW Frontage Road

What is being built at 5000 NW Frontage Road in Sealy?

TDLR registrations describe new copper manufacturing, warehouse and support buildings, as well as renovations to existing buildings at the multi-tenant industrial site. The latest registration, filed October 14, 2026, covers work in Building 6.

Is a new warehouse planned at 5000 NW Frontage Road?

Yes. A July 30, 2026, TDLR registration for Building 29 describes a new 58,442-square-foot warehouse for storing copper pipes and bars. Its registration number is TABS2026026595.

What is planned for Building 20 at the Sealy copper facility?

The June 3, 2026, registration describes a new building for copper casting and manufacturing, with offices and warehousing. It lists 859,275 square feet and registration number TABS2026021888.

Are existing buildings at 5000 NW Frontage Road being renovated?

Yes. Registrations describe renovations to several existing buildings, including Buildings 6, 8, 11 and 16. Work includes manufacturing-related upgrades and associated mechanical, electrical and plumbing systems.

What is the estimated cost of the Sealy facility project?

TDLR lists an applicant estimate of $35 million for the project. This is an estimate, not a reported total project cost.

When were projects at 5000 NW Frontage Road registered?

The records show 11 TDLR project registrations, filed between November 14, 2025, and October 14, 2026. The latest is for Building 6 renovations and is numbered TABS2027003515.

More warehouses & industrial in 77474, offices in 77474, retail spaces in 77474.