1300 TX 46
Seguin, TX 78155 · Ddo1-Texas LLC
KFC interior finish-out filed for existing Seguin space
A 1,923-square-foot interior finish-out of existing space into a KFC was registered with the Texas Department of Licensing and Regulation on June 21, 2024. The project record lists an estimated cost of $350,000 and is marked closed. A separate filing for the same address, dated May 28, 2026, describes an interior finish-out for a Smoothie King.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 21, 2024
- since Jun 21, 2024
- Largest scope
- 1,923 sf
- Estimated cost
- $350K
- state registration
Where this project stands
CompletedKFC - Seguin Lease
1,923 sq ft · $350K est.
- RegisteredJun 21, 2024
- Plan review
- ConstructionAug '24 – Dec '24
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior finish out of existing space into a kfc — kfc
TDLR project registrationRenovation/AlterationProject Closed1,923 sq ft$350K est.- Project #
- TABS2024021418
- Tenant / owner
- Kfc - Seguin Lease
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1300 TX 46
What is being built at 1300 TX 46 in Seguin?
A TDLR registration filed June 21, 2024, describes a 1,923-square-foot interior finish-out of existing space into a KFC. The project is marked closed.
Is a KFC opening at 1300 TX 46?
The 2024 TDLR record describes an interior finish-out into a KFC, but does not confirm an opening date or current operating status. It lists the project as closed.
What is the latest project filing for 1300 TX 46?
A nearby-activity record for the same address lists a filing dated May 28, 2026, describing an interior finish-out for a new Smoothie King location.
How large is the KFC project at 1300 TX 46?
The TDLR registration lists the project area as 1,923 square feet.
How much will the 1300 TX 46 project cost?
The 2024 TDLR registration lists an estimated project cost of $350,000. This is the applicant's estimate, not a confirmed final cost.
What's being built near Prerna in Seguin?
At 1300 TX 46, the TDLR record describes a KFC interior finish-out filed June 21, 2024. A separate filing for the same address describes a Smoothie King interior finish-out dated May 28, 2026.
Also being built nearby
All of 78155- 1300 State Highway TX-46 · Prerna LLCMay 28, 2026Smoothie king-sequin — renovation/alteration — interior finish out of an existing shell lease space for a new smoothie king location. total area of
- 751 Best Drive · Best Drive 777 LLCMar 19, 2024Lassen — new construction — tenant finish-out · 197 m away
- 1331 Ch Matthis Jr · Elks Lodge #1229Jun 10, 2024Elks lodge — renovation/alteration — re-install drywall 2' on perimiter of venue hall, texture, paint, install epoxy flooring and reinstall all doors, trim, cooler and bathroom fixtures · 359 m away
- 1510 TX-46 North · Louetta Leasing LPNov 10, 2025Laynes chicken fingers — new construction — ground up with interior finish out · 375 m away
- 1100 State Highway 46 North · Express Oil Change, LLCAug 12, 2026Eoc 26014 seguin, texas — new construction — new construction of a 7,043 square foot automotive repair and maintenance shop for service of non-commercial vehicles · 408 m away
- 2010 I-10 West · Waste ConnectionsApr 7, 2025Waste connections - office trailer — new construction — replace removed modular office trailer building with a new modular manufactured building · 558 m away
- 1832 IH 10 W · Griffith Ford Seguin Land LLCFeb 27, 2025El jalisco - seguin texas — renovation/alteration — remodel existing kitchen area, add a new exterior wic, and storage area · 588 m away