Recent · latest filing Sep 2025Commercial

1441 Joe Carrillo Blvd St

Seguin, TX 78155 · City Of Seguin

Seguin registers 0.78-mile shared-use path project

A 10-foot-wide shared-use path and accessible crosswalks are planned along Joe Carrillo Street and Countryside Boulevard in Seguin. The project was registered with the Texas Department of Licensing and Regulation on September 2, 2025; the applicant’s estimated project cost is $1,259,000.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 2, 2025

Projects
1
1 filings
Latest filing
Sep 2, 2025
since Sep 2, 2025
Largest scope
34,560 sf
Estimated cost
$1.3M
state registration

Where this project stands

Under construction

Joe Carrillo Blvd/Countryside Blvd Shared Use Path (SUP)

34,560 sq ft · $1.3M est.

  1. RegisteredSep 2, 2025
  2. Plan review
  3. ConstructionMar '26 – Apr '27
  4. Inspected
  5. Closed
64% through of a 13-month buildMar 10, 2026 → Apr 12, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Construct 0.78 miles (34,560 sq ft) of proposed 10' wide shared-use path (sup) improvements and accessible cross-walks on joe carrillo st and country side blvd. — joe carrillo blvd/countryside blvd shared use path (sup)

    TDLR project registrationNew ConstructionReview Complete34,560 sq ft$1.3M est.
    Tenant / owner
    Joe Carrillo Blvd/Countryside Blvd Shared Use Path (sup)
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1441 Joe Carrillo Blvd St

What is being built at 1441 Joe Carrillo Blvd in Seguin?

A proposed 0.78-mile shared-use path and accessible crosswalks on Joe Carrillo Street and Countryside Boulevard were registered with TDLR on September 2, 2025.

How long will the Joe Carrillo and Countryside shared-use path be?

The TDLR registration describes 0.78 miles of proposed path improvements, covering 34,560 square feet.

How wide is the planned path on Joe Carrillo Street?

The registration describes a proposed 10-foot-wide shared-use path, along with accessible crosswalks.

How much will the Seguin shared-use path project cost?

The applicant’s estimated cost is $1,259,000, according to TDLR registration TABS2026000063. This is an estimate for the project.

What is being built near Seguin Independent School District on Joe Carrillo Street?

A shared-use path and accessible crosswalks are planned along Joe Carrillo Street and Countryside Boulevard. The project registration was filed September 2, 2025, near the Seguin Independent School District address at 1539 Joe Carrillo Street.

Is a new path planned near 720 Harry Miller Pass in Seguin?

A 0.78-mile shared-use path project on Joe Carrillo Street and Countryside Boulevard was registered with TDLR on September 2, 2025. The listed address at 720 Harry Miller Pass is about 553 meters from the project address.

Also being built nearby

All of 78155
Email me when it passes inspection