16443 North Evans Road
Selma, TX 78154 · City Of Selma
Selma plans site work for emergency operations training center
A site package for Selma’s future police and fire emergency operations training center was registered with TDLR on October 1, 2025. The work covers a 5.5-acre site and includes an initial drive, paving, utility stub-outs, a burn tower pad and landscaping; the registration says no buildings are included in this package. The applicant’s estimated project cost is $2.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 1, 2025
- since Oct 1, 2025
- Largest scope
- 239,580 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
Finishing up · inspection next#24006 - Selma Emergency Operations Training Center
239,580 sq ft · $2.5M est.
- RegisteredOct 1, 2025
- Plan review
- ConstructionNov '25 – May '26
- Inspectednow
- Closed
Scheduled to finish May 15, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSite package for a future police & fire emergency operations training center, on a 5.5 acre (239,580 sq ft) site. includes initial drive, paving, utility stub outs, burn tower pad, & landscaping - no buildings included. — city of selma public emergency operations training center
TDLR project registrationNew ConstructionReview Complete239,580 sq ft$2.5M est.- Project #
- TABS2026002353
- Tenant / owner
- #24006 - Selma Emergency Operations Training Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 16443 North Evans Road
What is being built at 16443 North Evans Road in Selma?
A site package for a future police and fire emergency operations training center is registered for the address. The package includes site work, not buildings.
What site work is planned for the Selma emergency operations training center?
The TDLR registration lists an initial drive, paving, utility stub-outs, a burn tower pad and landscaping on a 5.5-acre site.
When was the emergency operations training center project registered?
The project was registered with TDLR on October 1, 2025. It is listed as TABS2026002353, with a status of Review Complete.
Are buildings included in the Selma training center permit?
No buildings are included in this site package, according to the TDLR project description. It covers site improvements for a future police and fire emergency operations training center.
How much will the Selma emergency operations training center cost?
The TDLR registration gives an applicant estimate of $2.5 million for the project.
What is being built near River City Community Church in Selma?
A site package for Selma’s future police and fire emergency operations training center is registered at 16443 North Evans Road, about 586 meters from River City Community Church. The package includes paving, utility stub-outs, a burn tower pad and other site work.
Also being built nearby
All of 78154- 9375 Corporate Dr · Kyle Mcafee, Fire Chief - City Of SelmaJul 30, 2025Selma fire department remodel — renovation/alteration — mezzanine alteration · 564 m away
- 16765 Lookout Road · River City Community ChurchAug 12, 2024#22040 - river city community church real life community outreach — new construction — type s2 storage pre-engineered metal building for ministry food pantry and donation center. cad #1162895 · 586 m away
- 16765 Lookout Rd · River City Community ChurchSep 3, 2025Storage room addition — additions to existing building — pour slab and add a metal structure to the exterior of the existing metal building for storage purposes · 586 m away
- 9388 Corporate Drive · Corporate Drive Industrial ComplexMay 30, 2024Building 2 speculative suite at corporate drive industrial complex — new construction — finish-out of existing suite at corporate drive industrial complex · 592 m away
- 9388 Corporate Dr · Corporate Drive Logistics CenterOct 21, 2026Building 2 southland industries expansion at corporate drive — renovation/alteration — interior finish-outs consisting of 16,149 sq ft of office and 214,640 sq ft of warehouse for suites 200, 220, and 240 inside building 2 at corporate drive logistics center · 592 m away