104 E College Street
Stephenville, TX 76401 · Gentry Shelton Building
Gentry Shelton Building renovation registered in Stephenville
A renovation of the existing Gentry Shelton Building at 104 E. College Street was registered with the Texas Department of Licensing and Regulation on February 3, 2025. The project covers 3,486 square feet and describes new interior infill and repairs to the existing limestone walls and wood roof. The applicant’s estimated project cost is $500,000.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 3, 2025
- since Feb 3, 2025
- Largest scope
- 3,486 sf
- Estimated cost
- $500K
- state registration
Where this project stands
In state plan reviewGentry Shelton Building
3,486 sq ft · $500K est.
- RegisteredFeb 3, 2025
- Plan reviewnow
- ConstructionMar '25 – Mar '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation to an existing building. existing condition of structural limestone walls with existing wood roof. new interior infill to be constructed out of wood or metal studs. repairs to be made to the existing structure to match existing materials. — gentry shelton building
TDLR project registrationRenovation/AlterationProject Registered3,486 sq ft$500K est.- Project #
- TABS2025010969
- Tenant / owner
- Gentry Shelton Building
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 104 E College Street
What is being built at 104 E. College Street in Stephenville?
The project is a renovation of the existing Gentry Shelton Building, not a new building. The registration describes interior infill and repairs to the existing structure.
When was the Gentry Shelton Building renovation permitted?
The project was registered with the Texas Department of Licensing and Regulation on February 3, 2025. The registration number is TABS2025010969.
How large is the Gentry Shelton Building renovation?
The registered project covers 3,486 square feet.
How much will the Gentry Shelton Building renovation cost?
The applicant’s estimated cost for the project is $500,000. This is an estimate, not a confirmed final cost.
What work is planned for the existing building?
The registration describes new interior infill made from wood or metal studs, plus repairs to the existing structural limestone walls and wood roof to match existing materials.
What is being renovated near the Long Street Hotel on East College Street?
The Gentry Shelton Building at 104 E. College Street is registered for renovation. The Long Street Hotel is listed about 90 meters away.
Also being built nearby
All of 76401- 104 E. College St · Grand Oaks Ranch Partners, LLCSep 2, 2026Gentry-shelton renovation - stephenville — renovation/alteration — renovation of an existing two-story commercial building, including interior alterations, accessibility improvements, new storefront work, and associated architectural, structural, mechanical, electrical, and plumbing improvements
- 164 East College St · Maynard Property InvestmentsMar 20, 2026Maynard remodel — renovation/alteration — two story historic building adaptive re-use · 40 m away
- 221 E. College St · Long Street Hotel, LLCAug 11, 2025The wyatt 1st floor finish out — renovation/alteration — 4,000sf of finish out, new paint, new sheetrock, new bathroom tile, new electrical fixtures and outlets, new floor carpet tiles, new window trim · 90 m away
- 133 W. Washington · Tarleton State University - Facilities ManagmentJul 22, 2024Fine arts paving project — new construction — pedestrian paving and landscape improvements · 102 m away
- 157 West Washington Street · Stephenville Rentals, LLCApr 24, 2024Jake wilson duplex over commercial lease space — renovation/alteration — historical rehabilitation of building including a second story duplex over a first story commercial lease space · 104 m away
- 320 W. College St · Erath CountyOct 6, 2025Erath county eoc addition and renovation — additions to existing building — the existing building located at 320 w. college street is to be converted to an emergency operations center for erath county. the building will undergo major renovations and an addition to the existing structure · 187 m away