12535 Reed Road Level 1 & Level 2
Sugar Land, TX 77478 · Resico, LLC
MSF Electric space renovation at 12535 Reed Road
A 19,360-square-foot renovation to an existing space at 12535 Reed Road is listed for MSF Electric. The TDLR project registration was filed February 19, 2025, with an estimated project cost of $700,000; its status is Project Closed.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 19, 2025
- since Feb 19, 2025
- Largest scope
- 19,360 sf
- Estimated cost
- $700K
- state registration
Where this project stands
CompletedMSF ELECTRIC
19,360 sq ft · $700K est.
- RegisteredFeb 19, 2025
- Plan review
- ConstructionFeb '25 – May '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation to an existing space — 12535 reed road
TDLR project registrationRenovation/AlterationProject Closed19,360 sq ft$700K est.- Project #
- TABS2025012345
- Tenant / owner
- Msf Electric
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 12535 Reed Road Level 1 & Level 2
What is being built at 12535 Reed Road?
A TDLR registration describes a renovation to an existing space for MSF Electric. The project covers 19,360 square feet and is marked Project Closed.
When was the 12535 Reed Road renovation filed?
The TDLR project registration was filed February 19, 2025. Its project number is TABS2025012345.
How much will the renovation at 12535 Reed Road cost?
The TDLR registration lists an estimated project cost of $700,000. This is the applicant's estimate for the project.
Is MSF Electric opening at 12535 Reed Road?
The record describes a renovation to an existing space for MSF Electric; it does not say that a new location is opening. The project is marked Project Closed.
What is being renovated near Fort Bend ISD in Sugar Land?
A TDLR record lists a 19,360-square-foot renovation to an existing space for MSF Electric at 12535 Reed Road, about 225 meters from Fort Bend ISD. The filing date was February 19, 2025.
What project is happening near Schlumberger Technology Corporation on Industrial Boulevard?
The record for 12535 Reed Road lists a renovation to an existing space for MSF Electric. The address is about 378 meters from Schlumberger Technology Corporation at 555 Industrial Boulevard.
Also being built nearby
All of 77478- 12560 Reed Rd · Prc 02 Reed Road LLCMar 12, 2024Envent engineering — renovation/alteration — commercial office renovation · 200 m away
- 550 Julie Rivers Drive · Fort Bend ISDOct 29, 2024Bp-017-triplex center renovations — renovation/alteration — renovation of existing office and meeting space totaling 35,000 sq ft · 225 m away
- 500 Industrial Blvd · Api Investments, LLCAug 15, 2025Advance polybag, nevada — renovation/alteration — interior commercial renovation located within an existing commercial tenant · 361 m away
- 555 Industrial Blvd · Schlumberger Technology CorporationOct 8, 2024Schlumberger interior office remodel — renovation/alteration — renovation of open office into private offices · 378 m away
- 12626 A Dairy Ashford Road · Jam Data Center, LLCDec 2, 2025Bitties — additions to existing building — installation of climate controlled storage · 525 m away
- 12626a Dairy Ashford Rd · Truss Data Centers LLCNov 9, 2026Pole d 6 mw electrical service and standby power — renovation/alteration — pour 14' x 21' pad for new transformer installation. no changes to existing building · 525 m away
- 10402 Fountaingate Drive · Decheng InvestmentsJan 2, 2026Evoluciona building a offices — renovation/alteration — tenant finish out for existing tilt shell building for corporate office space and storage. totally approx. 3,500 sq ft · 571 m away
- 12682 Cardinal Meadow Dr · Api Realty LLCOct 8, 2026Accredo packaging phase 1 site development — additions to existing building — this project consists of expanding an existing parking lot and installing a prefabricated dockzilla loading platform next to an existing on-site rail spur. this includes construction of new pavement, curbs, parking striping, and rcp drainage pipes · 577 m away