13139 Jess Pirtle Blvd
Sugar Land, TX 77478 · Aoi Fab1 Bldg B Clean Rm Expansion, Gas Storage Building + 2 more
Clean room, gas-storage and office work in Sugar Land
TDLR project registrations list industrial work at this multi-tenant address from October 2025 through October 2026. The projects include a 7,000-square-foot clean room expansion, gas-storage and gas-room work, and an office expansion.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 19, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 19, 2026
- since Oct 9, 2025
- Largest scope
- 7,000 sf
- Estimated cost
- $650K
- state registration
Where this project stands
In state plan reviewAOI FAB1 Bldg B Clean Rm Expansion
7,000 sq ft · $650K est.
- RegisteredOct 19, 2026
- Plan reviewnow
- ConstructionOct '26 – Jan '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
4 projectsAddition of ne electrical service and new clean room equipment — aoi fab1 building b
TDLR project registrationRenovation/AlterationProject Registered7,000 sq ft$650K est.- Project #
- TABS2027003914
- Tenant / owner
- Aoi Fab1 Bldg B Clean Rm Expansion
- Design firm
- Pro
- Contact
- Pro
Exterior construction for a gas storage building — aoi
TDLR project registrationNew ConstructionReview Complete433 sq ft$100K est.- Project #
- TABS2026025154
- Tenant / owner
- Gas Storage Building
- Design firm
- Pro
- Contact
- Pro
Arch and mep addition of 200sqft special gas room. — aoi fab1 building b gas rm add
TDLR project registrationAdditions to Existing BuildingReview Complete198 sq ft$125K est.- Project #
- TABS2026021209
- Tenant / owner
- Aoi Fab1 Gas Rm Addition
- Design firm
- Pro
- Contact
- Pro
Existing building expansion — applied optoelectronics inc
TDLR project registrationNew ConstructionReview Complete3,000 sq ft$450K est.- Project #
- TABS2026003070
- Tenant / owner
- Applied Optoelectronics, INC Office Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13139 Jess Pirtle Blvd
What is being built at 13139 Jess Pirtle Blvd?
TDLR records list a clean room expansion, a gas storage building, a gas room addition and an office expansion at the multi-tenant site. The filings range from October 2025 to October 2026.
When were the projects at 13139 Jess Pirtle Blvd filed?
The earliest listed registration was filed October 9, 2025, for an office expansion. The latest was filed October 19, 2026, for a clean room expansion.
How large is the clean room expansion in Sugar Land?
The October 19, 2026, TDLR registration lists 7,000 square feet of renovation and alteration work, including new electrical service and clean room equipment.
Is there a gas storage building planned at this address?
A TDLR registration dated July 13, 2026, lists exterior construction for a 433-square-foot gas storage building. Its status is listed as Review Complete.
What is the estimated cost of the clean room expansion?
The TDLR applicant estimate for the 7,000-square-foot clean room expansion is $650,000. This estimate applies to that project, not all work at the address.
What projects are listed near Applied Optoelectronics Fab 2?
Records list an office expansion, gas-room addition, gas storage building and clean room expansion at 13139 Jess Pirtle Blvd, about 300 meters from Applied Optoelectronics Fab 2 at 1111 Gillingham.
Also being built nearby
All of 77478- 1111 Gillingham Lane · Coleman Logistics Assets, LLCJun 2, 2026Aoi fab2 tenant improvement — renovation/alteration — alterations to 2 floors of office space, includes mep revisions · 300 m away
- 1111 Gillingham Ln · Coleman Logistics Assets LLCJan 28, 20261111 gillingham lane — renovation/alteration — build out of a fire rated corridor in an existing office space 35872sf · 300 m away
- 1111 Gillingham · Applied Optoelectronics INCFeb 4, 2026Applied optoelectronics fab 2 — renovation/alteration — the project entails a comprehensive renovation of an interior design-build of approximately 110,000 sq ft of iso 7 or iso 6 certified cleanroom space with esd floor and hvac air handling system within an existing 137,699 sq ft warehouse · 300 m away
- 1410 Gillingham Ln · 1410 Gillingham, Llc.Aug 12, 2024Frazer bts — additions to existing building — project scope includes modifications to an existing two-story, fully sprinklered, type ii-b building existing offices and restroom. proposed renovation includes demolishing portions of existing construction and an addition to the building · 514 m away