14777 Voss Road
Sugar Land, TX 77498 · Fort Bend Independent School District
Kempner HS fields to get synthetic turf and renovations
Fort Bend Independent School District registered a renovation at Kempner High School to replace the natural grass baseball and softball fields with synthetic turf and renovate the backstops, dugouts and netting. The TDLR registration was filed October 20, 2025. The applicant estimated the project cost at $3,688,150.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 20, 2025
- since Oct 20, 2025
- Largest scope
- 1,020 sf
- Estimated cost
- $3.7M
- state registration
Where this project stands
Under constructionBP010 Turf & Athletics at 5 HS - Kempner HS
1,020 sq ft · $3.7M est.
- RegisteredOct 20, 2025
- Plan review
- ConstructionMay '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplace natural grass baseball and softball fields with synthetic turf, renovate baseball and softball backstops, dugouts, and netting — kempner hs
TDLR project registrationRenovation/AlterationReview Complete1,020 sq ft$3.7M est.- Project #
- TABS2026003758
- Tenant / owner
- Bp010 Turf & Athletics At 5 Hs - Kempner Hs
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 14777 Voss Road
What is being built at 14777 Voss Road in Sugar Land?
The project is a renovation at Kempner High School: synthetic turf will replace natural grass on the baseball and softball fields, and the backstops, dugouts and netting will be renovated. The TDLR registration was filed October 20, 2025.
Are the baseball and softball fields at Kempner High School getting turf?
Yes. The project description says natural grass baseball and softball fields will be replaced with synthetic turf.
What else is included in the Kempner High School field renovation?
The registration also lists renovations to the baseball and softball backstops, dugouts and netting.
How much will the Kempner High School turf project cost?
The applicant estimated the project cost at $3,688,150 in TDLR registration TABS2026003758. This is an estimate, not a reported final project cost.
When was the Kempner High School field project registered?
The TDLR registration was filed October 20, 2025, and is listed as Review Complete.
What’s being renovated near Chick-fil-A on Highway 6 in Sugar Land?
At Kempner High School, about 597 meters from the listed Chick-fil-A, a project will replace natural grass baseball and softball fields with synthetic turf and renovate backstops, dugouts and netting. The registration was filed October 20, 2025.
Also being built nearby
All of 77498- 14777 Voss Rd · Fort Bend Independent School DistrictDec 19, 2025Bp012 field house and athletic renovations — renovation/alteration — renovation of existing locker rooms, resurfacing of track and field events, renovation of existing press boxes. new concessions and restroom building
- 14777 Voss Rd., Sugar Land · Fort Bend Independent School DistrictJan 16, 2026Bp038 sitework package 3 — renovation/alteration — sitework improvements - parking, sidewalks, fences, gates, ramps
- 15015 Voss Road · Royal Garden Holdings LLCApr 2, 2026Imperial royal garden plaza — new construction — shell building for future tenants with retail businesses · 271 m away
- 11510 Hwy 6 S · Chick-Fil-AJul 16, 2025Hwy 6 & w airport fsu — new construction — ground up construction of quick service restaurant with drive-thru and stand alone canopies · 597 m away